background image

                                                          

 

- 3 - 

 

 

3

 

Important Safety Notice

 

ACER S190HQL

 

1

 

 

Product Announcement:

 

 

This product is certificated to meet RoHS Directive and Lead-Free produced definition. Using approved 

critical components only is recommended when the situation to replace defective parts. Vender assumes 

no liability express or implied, arising out of any unauthorized modification of design or replacing non-

RoHS parts. Service providers assume all liability.

 

 
 

Qualified Repairability:

 

 

Proper service and repair is important to the safe, reliable operation of all series products. The service 

providers recommended by vender should being aware of notices listed in this service manual in order 

to minimize the risk of personal injury when perform service procedures. Furthermore, the possible 

existed improper repairing method may damage equipment or products. It is recommended that service 

engineers should have repairing knowledge, experience, as well as appropriate product training per 

new model before performing the service procedures.

 

 
 

NOTICE:

 

 

To avoid electrical shocks, the products should be connect to an authorized power cord, and turn off 

the master power switch each time before removing the AC power cord.

 

To prevent the product away from water or exposed in extremely high humility environment.

 

 

To ensure the continued reliability of this product, use only original manufacturer

’s specified parts.

 

 

To ensure following safety repairing behavior, put the replaced part on the components side of PWBA, 

not solder side.

 

To ensure using a proper screwdriver, follow the torque and force listed in assembly and 

disassembly procedures to screw and unscrew screws.

 

Using Lead-Free solder to well mounted the parts.

 

 

The fusion point of Lead-Free solder requested in the degree of 220°C.

 

Summary of Contents for R240HY

Page 1: ...1 ACER_Monitor R240HY LIFECYCLE EXTENSION GUIDE...

Page 2: ...Mechanical Instructure 6 4 Assembly and Disassembly Procedures 7 5 Troubleshooting 15 6 FRU List 18 Safety Notice Any person attempting to service this chassis must familiarize with the chassis and be...

Page 3: ...repairing method may damage equipment or products It is recommended that service engineers should have repairing knowledge experience as well as appropriate product training per new model before perfo...

Page 4: ...4 1 Exploded Diagram...

Page 5: ...5 2 Wiring Connectivity diagram...

Page 6: ...and size of the tools that would typically can be used to disassemble the product to a point where components and materials requiring selective treatment can be removed Tool Description working table...

Page 7: ...7 4 Assembly and Disassembly Procedures Disassembly Procedure Step 1 Pull the base stand assembly out Step 2 Unscrew four screws Step 3 Remove the rear cover and pull the connect out...

Page 8: ...embly out again from Rear Cover Step 5 Remove all yellow tapes and separation four connectors Step 6 separate speaker from MID_FRAME and LVDS Backlight FFC from LCM Step 7 Separation two Al tapes and...

Page 9: ...9 Step 8 Unscrew screws Step 9 Remove from MID frame Step 10 Separation the display key assembly Step 11 Separation the cable and the plastic...

Page 10: ...10 Step 12 Unscrew two hex nuts and two screws Step 13 Unscrew the screw and separate base stand assembly...

Page 11: ...11 Step 14 Separation four cilicon rubbers...

Page 12: ...ure Step1 Assembly main board into shielding use AL tape fix Assembly main board on LCM Step2 Insert 30 pin LVDS FFC to LCM then use yellow tape to tape FFC Step3 Insert 6pin back light wireless to pa...

Page 13: ...the key board to the plastic and 8pin FFC assembly to key board Step5 Assembly the plastic to mid frame Step6 Assembly middle frame with LCM Step7 Lock middle frame screw in red circle and insert 8pin...

Page 14: ...14 Step8 Assembly rear cover and push around the surrounding to assembly well Step9 Lock the screw on rear cover in red circle...

Page 15: ...15 5 Troubleshooting 5 1 Test flow for abnormal machine...

Page 16: ...16 5 2 LED backlight debug flow End...

Page 17: ...17 5 3 Power debug flow...

Page 18: ...15 BC LF CABLE 50 T2PM5 004 R032100H01080 RGB CABLE 1500mm 15 3R 3R 30 3G 30 2C 30 4C AL65 POWER CORD 27 LTK0K 001 R032030000180 POWER CORD 1500mm 16A 250V EUROPE CASE COVER BRACKET ASSEMBLY 60 T4AM5...

Reviews: