25
Locate the key board cable and fix the cable on the specific position as the below picture remarked in red
circle.
Turn over the MAINFRAME. Use a Hex-head screwdriver to tighten four screws and use a Philips-head
screwdriver to unscrew a screw for locking the VGA connector and DVI connector.
Assemble the SHIELD_AUDIO.
Prepare a panel. Assemble panel and MAINFRAME. Put the MAINFRAME on the panel and connect the FFC
cable (main board to panel). Stick the tape as below right picture.
Connect the wires (power board to panel) as below picture.
S4
S5
S7
S8
S6
S4
Summary of Contents for B223PWL
Page 1: ...ACER_LCD_B223PWL_V223PWL_SM20120424V0 ...
Page 5: ...3 ...
Page 6: ...4 ...
Page 21: ...19 ...
Page 45: ...43 Monitor USB port driver ISP tool New F W 6 2 Connection ...
Page 47: ...45 ...
Page 49: ...47 Click Finish to complete the USB serial port driver installation ...
Page 56: ...54 PC Monitor LPT port driver ISP tool VgaSinglePort exe EDID ...
Page 77: ...75 9 2 Layout Main Board 715G3361 2 ...
Page 78: ...76 ...
Page 79: ...77 ...
Page 80: ...78 ...
Page 81: ...79 Power Board 715G3350P02005001S ...
Page 82: ...80 ...
Page 83: ...81 ...
Page 84: ...82 Converter Board 715G4013P03001004S ...
Page 85: ...83 ...
Page 86: ...84 Key Board 715G2944 3 ...