CHECKING THE FOAM AND PUT IT TO
THE PRODUCTION LINE.
CHECKING THE SHIELDING AND
STICK 2*PCS FOAM.
PUT THE FLOW CARD TO THE
BOARD.
SCAN THE FLOW CARD AND CODE OF
P/B INTO THE TMS SYSTEM.
INSERT THE JUMP CABLE INTO THE
P/B AS LEFT SHOW.
CONNECT THE JUMP CABLE AND P/B
WITH WHITE GOOEY
MARK THE LOCATION WITH COLOR
PEN AS LEFT SHOW.
PUT IT TO THE PRODUCTION LINE.
CHECKING THE M/B AND LVDS
CABLE, AND INSERT THE LVDS
CABLE INTO THE JOINT OF M/B.
INSERT THE M/B-P/B CABLE INTO
THE JOINT OF M/B AND P/B.
PUT THE CONNECTED M/B AND P/B
TO THE SHIELDING, THEN PUT IT TO
PRODUCTION LINE.
Assembly process
Summary of Contents for AT1921
Page 15: ...PCB CONDUCTOR VIEW MAIN BOARD ...
Page 16: ......
Page 17: ...BUTTON BOARD ...
Page 18: ...USB BOARD ...
Page 19: ...POWER BOARD ...
Page 26: ... 26 Real View Top View ...
Page 27: ...Side View unit mm ...
Page 44: ......
Page 61: ......