- 28 -
1. INSERT SPEAKER CABLE IN M/B
CONNECTOR
2. GET M/B AND ASSEMBLE IT WITH
POWER/B,THEN ASSEMBLE THEM IN
PCB SHIELD
1. FASTEN 1*PCS SCREW(M 4*8-B) IN P/B
2. FASTEN 2*PCS SCREW(M 3*6-T) IN P/B
3.
FASTEN 2*PCS SCREW(M 3*6-T) IN
M/B
1. FETCH POWER/B MYLAR PUT IT ON
SHIELD AND FASTEN 1*PCS SCREW(M
3*6-T
2. FASTEN 1*PCS SCREW(M 3*6-T) IN M/B
3. GET THE SHIELD AT FRONTAGE OF
THE CONVEYER
2
1
Summary of Contents for AL1923
Page 14: ... 14 Monitor Block Diagram ...
Page 15: ......
Page 16: ......
Page 23: ... 25 Real View Top View ...
Page 24: ... 26 Side View unit mm Exploded view ...
Page 25: ......
Page 37: ... 38 ...
Page 41: ... 42 Chapter 7 SCHEMATIC DIAGRAM Main Board Circuit ...
Page 42: ... 43 ...
Page 43: ... 44 ...
Page 44: ... 45 ...
Page 45: ... 46 ...
Page 46: ... 47 ...