ARNING

PRODUCT

SAFETY NOTICE

AJAX BOILER AND WATER HEATER PRODUCTS OPERATE AT HIGH TEMPERATURE AND PRESSURES

• 

Before using this product, read and understand instructions.  Save these instructions for future use.

• 

Before servicing, to prevent serious burns or injury, the boiler and water heater products must be cooled to less than  

 

80°F (27°C) and the pressure must be 0 psi (0 bar).

• 

Turn off the electrical power before making electrical connections to prevent electrical shock.

• 

These products must be placed in a controlled location where untrained or unqualifi ed personnel cannot access the  

 

 

operating or safety controls, must not be able to come in contact with high temperature or high pressure parts and must  

 

not perform maintenance or demolition work. 

• 

All work performed must be by qualifi ed properly equipped personnel trained in the proper application, installation, and 

 

maintenance or demolition of plumbing, steam, and electrical equipment and/or systems in accordance with all 

 

applicable codes and ordinances.

• 

Ajax Boilers and Water Heaters are complete package units with safety and operating controls and are constructed with 

 

non ASBESTOS materials.   Any replacement gaskets, refractory, insulation, etc used must not contain Asbestos. 

• 

No additional insulation is required on the Boilers and Water Heaters. 

• 

Additions or replacement of insulation on any connecting pipes or accessories to the Boilers and/or Water Heaters must 

 

be of “NON-ASBESTOS” and contain only non-hazardous materials.

• 

Crystalline Silica, a material known to cause cancer, may be encapsulated in some refractory or insulation materials 

 

and must be handled only by authorized trained personnel.   Crystalline Silica as used is encapsulated and is not harm 

 

full in this form.  Care must be taken during removal or replacement of refractory or insulation to remove it in bulk 

 

form and avoid generation or inhalation of dust.   Removal must be properly performed by trained, qualifi ed and 

 

equipped personnel.   This is also true of Asbestos not contained in Ajax products but may be otherwise contained in 

 

replacement materials or parts, in connecting piping or other nearby products.  

• 

All safety and operating controls must be set within the specifi ed operating limits and tested periodically to assure proper 

 

operation.  All limit and operating controls must be installed in series on the boiler.

• 

Connect drain pipes to a safe drain to prevent serious personal injury from relief valve discharge and or from boiler blow 

 down 

discharge.

• 

After installation, check for proper operation of all limit and operating controls before leaving the site.

• 

Perform scheduled and annual inspections including checking Controls for proper calibration and performance.  

Failure to follow these warnings, to allow access by unauthorized persons and the use of non-properly trained and 

equipped personnel in the operation, service, modifi cation, removal or demolition of these products or replacement 

of parts with non-authorized factory non-asbestos materials could cause damage, personal injury or death.

2701 South Harbor Blvd.
Santa Ana, California 92704
United States
Tel. (714) 437-9050
Fax (714) 437-9060
http://www.ajaxboiler.com
[email protected]

          A

CE 

Heating Solutions, LLC 

                 2701 S. H

ARBOR 

B

LVD

. • S

ANTA 

A

NA

, CA 92704 

                 P

HONE

: (714) 540-2230 • FAX: (714) 540-2239 

                                 www.aceheatingllc.com 

                 Ace Heating Solutions, LLC

November 2014 ace

                            ACE  BOILER AND WATER HEATER PRODUCTS OPERATE AT HIGH TEMPERATURE AND PRESSURES 
 

• Before using this product, read and understand instructions. Save these instructions for future use. 
• Before servicing, to prevent serious burns or injury, the boiler and water heater products must be cooled to less than 
80°F (27°C) and the pressure must be 0 psi (0 bar). 
• Turn off the electrical power before making electrical connections to prevent electrical shock. 
• These products must be placed in a controlled location where untrained or unqualified personnel cannot access the 
operating or safety controls, must not be able to come in contact with high temperature or high pressure parts and must 
not perform maintenance or demolition work. 
• All work performed must be by qualified properly equipped personnel trained in the proper application, installation, and 
maintenance or demolition of plumbing, steam, and electrical equipment and/or systems in accordance with all 
applicable codes and ordinances. 
• ACE Boilers and Water Heaters are complete package units with safety and operating controls and are constructed with 
non ASBESTOS materials. Any replacement gaskets, refractory, insulation, etc used must not contain Asbestos. 
• No additional insulation is required on the Boilers and Water Heaters. 
• Additions or replacement of insulation on any connecting pipes or accessories to the Boilers and/or Water Heaters must 
be of “NON-ASBESTOS” and contain only non-hazardous materials. 
• Crystalline Silica, a material known to cause cancer, may be encapsulated in some refractory or insulation materials 
and must be handled only by authorized trained personnel. Crystalline Silica as used is encapsulated and is not harm 
full in this form. Care must be taken during removal or replacement of refractory or insulation to remove it in bulk 
form and avoid generation or inhalation of dust. Removal must be properly performed by trained, qualified and 
equipped personnel. This is also true of Asbestos not contained in ACE products but may be otherwise contained in 
replacement materials or parts, in connecting piping or other nearby products. 
• All safety and operating controls must be set within the specified operating limits and tested periodically to assure proper 
operation. All limit and operating controls must be installed in series on the boiler. 
• Connect drain pipes to a safe drain to prevent serious personal injury from relief valve discharge and or from boiler blow 
down discharge. 
• After installation, check for proper operation of all limit and operating controls before leaving the site. 
• Perform scheduled and annual inspections including checking Controls for proper calibration and performance. 
 
 

Failure to follow these warnings, to allow access by unauthorized persons and the use of non-properly trained and 
equipped personnel in the operation, service, modification, removal or demolition of these products or replacement 
of parts with non-authorized factory non-asbestos materials could cause damage, personal injury or death.

Summary of Contents for Packaged Storage Water Heater Steam-to-Water...

Page 1: ...Operating and Maintenance Manual Designed and Manufactured in Accordance with ASME Code Section VIII Photo shown may vary from actual model Packaged Storage Water Heater Steam to Water System U...

Page 2: ......

Page 3: ...ction 10 Before Start up Installation and hook up Start up Instruction Shut down instruction Safety features Operation of storage water heater 13 Trouble shooting Guide 14 Maintenance Instruction Remo...

Page 4: ...to control the heated water within the tank at the desired temperature This close control is accomplished by placing the temperature control element directly in the constant flow path of the circulat...

Page 5: ...tmospheric temperature H Serial number I Year built J Model number K Capacity L Square feet M Job number The Packaged Storage Water Heater Model Number P H G 72 10 G 2 1066 S A P Packaged H Type H Hor...

Page 6: ...anks Lifting Lug Water to Water Pneumatic Horizontal Water to Water Pneumatic Vertical Drain Storage Section Control Valve Press Temp Gauge Circulator Pump Boiler Water Supply Inlet Hot Water Outlet C...

Page 7: ...for domestic hot water the temperature control bulb will sense the drop in water temperature The temperature bulb sends a signal to the control valve to open and allow steam or hot boiler water into t...

Page 8: ...h all federal state and local codes as well as meet good industry practices as shown in publications issued by ASME AGA UL ASHRAE ABMA etc Placement The storage heater was either fabricated as a verti...

Page 9: ...each stud bolt and nut generously with penetrating oil before re torque Gasket thickness before compression All partition gaskets are in width before compression All gaskets expand twice their width a...

Page 10: ...wired according to the wiring diagram Verify the electrical supply using a voltmeter The voltage tie in leads are indicated on the wiring diagram This unit contains sensitive control components and sh...

Page 11: ...hook up condensate return to boiler condensate return tank Pipe size to correspond to opening size provided This pipe must run horizontal or pitch gradually to condensate tank with condensate level t...

Page 12: ...he circulator pump is running Please refer to the pump instruction manual for details 9 Manually open the main steam shut off valve upstream of the control valve and SLOWLY allow steam to pass through...

Page 13: ...steam control valve may require adjustment to set to desired tank temperature If the tank does not get hot enough the steam valve should be adjusted screwed in to a higher number If the tank temperatu...

Page 14: ...the setting of the pilot controller and adjust the hand wheel as necessary 2 Confirm steam supply pressure to the control valve meets that specified in the list of materials Check for a clogged strain...

Page 15: ...h or vacuum cleaner 8 Inspect anodes on glass lined tanks Replace anodes if 5 8 or less in diameter Failure to maintain anodes will void warranty Keep all records of anode inspection and replacement f...

Page 16: ...thin metal The bundle therefore should rest on parts designed to carry it i e on the tube sheets baffles or support plates For withdrawing tube bundles from the tank the use of steel eye bolts which a...

Page 17: ...and accept the product when received as conforming to their purchase order specifications and approved drawings All claims for non conformance errors shortages etc must be made within 10 days after re...

Page 18: ...boiler com mail ajaxboiler com February 2007 ACE Heating Solutions LLC 2701 S HARBOR BLVD SANTA ANA CA 92704 PHONE 714 540 2230 FAX 714 540 2239 www aceheatingllc com Ace Heating Solutions LLC Novembe...

Page 19: ...anta Ana California 92704 United States Tel 714 437 9050 Fax 714 437 9060 http www ajaxboiler com mail ajaxboiler com ACE Heating Solutions LLC 2701 S HARBOR BLVD SANTA ANA CA 92704 PHONE 714 540 2230...

Page 20: ...arious scales and foreign material by chemical cleaning is now being quite extensively practiced Certain qualified organizations will check the nature of deposits to be removed furnish proper acid sol...

Page 21: ...risis and optimum control Trim available in 316SS 17 4 pH Alloy 6 PEEK and PTFE Port Guided Plug Assembly provides stability and desired equal percentage flow characteristic Lower Plug offers easy acc...

Page 22: ...Threaded NPT or 316 Stainless Steel 300LB Threaded NPT Trim Linear 316 Stainless Steel Packing Guided Low Friction TFE V Ring Spring Loaded 32 to 450 F Adjustable Graphite Packing 32 to 500 F Tempera...

Page 23: ...70 1 97 1 22 0 96 0 70 0 43 0 17 0 626 4SR 3 40 3 41 2 38 1 64 1 20 0 75 0 51 0 39 0 26 0 13 LINEAR 1 676 FULL 17 2 15 5 13 8 12 0 10 3 8 60 6 88 5 16 3 44 1 72 1 1 2 EQ 1 676 FULL 24 0 22 5 19 7 15...

Page 24: ...Actuator Air Signal to Actuator IN IN IN Actuator Range 3 15 PSI 1 17 PSI 0 30 PSI 0 40 PSI 3 15 PSI 1 17 PSI 0 30 PSI 0 40 PSI 0 626 1 2 9 16 DL49 Low N A 67 226 560 720 720 thru Full N A 226 386 N A...

Page 25: ...e Models BFI_ Full Range Signal 4 20 mA BLI_ Low Range Signal 4 12 mA BHI_ High Range Signal 12 20 mA Options 2SPDT Limit Switches 4 20 mA Feedback Ingress Corrosion Protection NEMA 4X IP66 Approvals...

Page 26: ...itches 4 20 mA Feedback Intelligent with Foundation Fieldbus Models 540_ Full Range Signal 4 20 mA Calibration 3 Button Keypad Foundation Fieldbus Options 2SPDT Limit Switches 4 20 mA Feedback All Mod...

Page 27: ...roximity MARK 1 Position Indication Switches Feedback Settings Valve Type Position Switch 1 3 5 Switch 2 4 6 2820 Valve Closed Closed Open Valve Open Open Closed 2830 32 Upper Port Closed Closed Open...

Page 28: ...g and tagging together B is optional Warren Controls does not assume responsibility for the selection use or maintenance of any product Responsibility for proper selection use and maintenance of any W...

Page 29: ...embly provides stem guiding and protects packing box from entrained solids for longer packing life Thick Balancing Chamber in bronze 300 SS or 17 4pH EPDM O Ring or Fluoraz O Ring for higher temperatu...

Page 30: ...inless Steel or Alloy 6 Packing Guided Low Friction TFE V Ring Spring Loaded O Ring EPDM BRZ Fluoraz 797 300 SSTrim 17 4 pH or Alloy 6 Trim Temperature 32 to 300 F BRZ 32 to 350 F 125 FLG w 300 SSTrim...

Page 31: ...7 23 1 14 0 6 40 6 EQ 360 333 298 255 203 144 83 6 34 1 14 6 7 10 Valve Trim Travel Size IN Style 100 2 1 2 LINEAR 69 3 LINEAR 86 4 LINEAR 156 5 LINEAR 270 6 LINEAR 347 8 LINEAR 450 Valve Trim Travel...

Page 32: ...control signals coming directly from I P transducers with matching ranges The 0 30 and 0 40 columns apply to valves with a positioner or an I P transducer of suitable range 4 N A indicates that the a...

Page 33: ...N A High 10 30 40 N A N A N A 131 N A DL84 Low N A N A 12 N A 54 88 310 N A Full N A N A 12 N A N A N A 208 N A High 63 97 114 N A N A N A 208 N A DL84XR Xtra High 114 148 165 N A N A N A 208 N A DL1...

Page 34: ...ct 21 5 8 22 1 2 23 1 2 24 1 8 24 3 4 N A N A DL84 or 84XR Reverse 21 21 7 8 22 7 8 23 1 2 24 1 8 N A N A DL115 or 115XR Direct 34 34 7 8 35 7 8 36 1 2 37 1 8 38 3 8 39 1 8 DL115 or 115XR Reverse CF C...

Page 35: ...A N A See Note DL84XR DL115XR Reverse N A N A N A See Note Note The spring range of XR eXtended Range actuators varies with travel These actuators require positioners or I P s for modulating control A...

Page 36: ...s 2SPDT Limit Switches 4 20 mA Feedback Intelligent with Foundation Fieldbus Models 540_ Full Range Signal 4 20 mA Calibration 3 Button Keypad Foundation Fieldbus Options 2SPDT Limit Switches 4 20 mA...

Page 37: ...m depending on actuator and travel Proximity MARK 1 Position Indication Switches Feedback Settings Valve Type Position Switch 1 3 5 Switch 2 4 6 2920 22 23 Valve Closed Closed Open Valve Open Open Clo...

Page 38: ...s copper SS tubing T is optional SS tagging G Two lines 24 characters line is optional SS tubing and tagging together B is optional Warren Controls does not assume responsibility for the selection use...

Page 39: ...ody Cast Steel ASTM A216 WCB Stem 303 St Stl ASTM A582 Disc 3 4 5 420 St Stl ASTM A743 CA 40 Disc 6 12 304 St Stl ASTM A167 A240 Seat 3 4 5 420 St Stl ASTM A743 CA 40 Seat 6 12 316 St Stl ASTM A743 79...

Page 40: ...6 7 D8 1 D 869 2 5 D 5 2 D 75 0 D 1 D 52 BD929 D 2C D 8 D D 87 5 D 58 D 58 2 BD D 1 D D 9 D 9 D 7 2 287D 2 D 866 7 D D 98 2 5 D 82 D D 1 9 7D 58 D 8D 1 D 0 5 8 D 8 5 D 7 D D 55 1 D 877 287D 8D 1 D58 D...

Page 41: ...D 869 D 3 270D 9 270 7 25D 1 D 5 D 89 7 D 7 D 4 D 87 85D D 2 D 9 5 7 5BD 184 D 8 7D 87D 1 D B 9 D 7 D 89 7D 8 5 D 89 5 D 7 25D 1 D 0 5 8 D2 D87D 1 D527 D D27 2 2 5D27 287 8 D8 1 D9258 D 3 270D 9 270D8...

Page 42: ...0 5 F 0 3 C Mounting 1 2 NPT Air or Water Connections 1 8 NPT Drain Connection water only 1 4 NPT Shipping Weight 4 lbs 1 8 kg Sensitivity adjustable 3 1 to 27 9 kPa C 1 4 to 2 1 4 psi F Maximum Press...

Page 43: ...limeters Inches TC744 1 Page 3 The parts in Figure 7 are identified by letter in order of disas sembly For item number reference see Parts Drawing A item 3 adjusting knob with set screw B item 10 cove...

Page 44: ...Set Screw holds Accritem in well 1 2 NPT Brass Union Assembly No 744 106 Provides pressure tight connection for installing Accritem in pipe or tank where space does not permit rotation of Accritem bo...

Page 45: ...ed such defects are not due to abuse or chemical decomposition by chemical or galvanic action This express warranty is in lieu of and excludes all other warranties guarantees or representations expres...

Page 46: ...0 14 370 000 Series 174A Set 3 4 x 1 1 x 1 1 4 1 1 4 x 1 1 2 1 1 2 x 2 2 x 2 1 2 Pressure 20 x 25mm 25 x 32mm 32 x 40mm 40 x 50mm 50 x 65mm psi bars Model M3 Model M1 Model M1 Model M Model M 30 2 07...

Page 47: ...5 0 0 1 2 4 3 5 6 S t a r S 2 1 S t a r S 1 6 Wilo Star S 60 Hz 2 Circulating Pumps Product review Wilo Star Star S Function Equipment Technical data Wilo Star Cast iron body Wilo Star Star S Heizung...

Page 48: ...Regelger te Pumpenmanagement Wilo Star S Cast iron body S 16 F S 16 FX S 21 F S 21 FX Approved fluids other fluids on request Heating water Water glycol mixtures max 1 1 mixtures with more than 20 gly...

Page 49: ...roved fluids other fluids on request Heating water Water glycol mixtures max 1 1 mixtures with more than 20 glycol require reassessment of the hydraulic criteria Domestic hot water Performance Max del...

Page 50: ...lation Solarthermie Service Zubeh r Systeme Schalt und Regelger te Pumpenmanagement Wilo Star S Bronze body S 16 BFX S 21 BFX Approved fluids other fluids on request Heating water Water glycol mixture...

Page 51: ...0 7 Q 0 8 0 9 1 0 1 1 1 2 m 3 h 0 0 1 0 2 0 3 0 4 0 02 0 0 04 0 06 0 08 0 5 0 6 0 7 0 8 0 9 1 0 1 1 1 2 Wilo Star 3 BS 60 Hz H ft 1 0 0 2 P 1 W P 1 hp H m 10 0 30 70 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 U...

Page 52: ...ft P 1 W P 1 hp H m 20 0 60 2 4 6 8 10 12 14 16 18 US gpm 0 m 3 h Q 0 4 0 8 1 2 1 6 2 0 2 4 2 8 3 2 3 6 4 0 4 4 0 24 22 20 5 2 4 8 5 6 2 4 6 8 10 12 14 16 18 US gpm 0 24 22 20 0 04 0 0 08 0 12 0 16 0...

Page 53: ...ar Star S Heizung Klima K lte Trinkwasserzirkulation Solarthermie Service Zubeh r Systeme Schalt und Regelger te Pumpenmanagement Wiring diagramm Single phase motor 2 pole 1 115 V 60 Hz with integrate...

Page 54: ...U 6 5 1 e 8 11 e 16 1 5 e 16 3 3 3 e 16 3 11 e 16 5 1 e 16 1 1 e 4 NPSM 6 5 3 Star 16 F 6 3 e 8 5 1 e 4 7 e 8 1 5 e 16 3 3 e 16 3 1 e 4 3 11 e 16 5 3 e 16 5 3 e 16 6 5 1 Star 16 FX 6 3 e 8 5 15 e 16 7...

Page 55: ...128 3 0 3 Star 16 F 162 134 22 34 81 82 93 5 132 3 0 1 Star 16 FX 162 150 22 50 81 81 93 5 128 3 0 2 Star 16 BFX 162 150 22 50 81 81 93 5 128 3 3 2 Star 17 FX 216 176 33 55 108 82 96 0 130 4 9 2 Star...

Page 56: ...ce Subject to standard terms and conditions of sale Copyright Instrument Division Dresser Industries Inc 5 95 CG 10 21 20M HG rev 10 97 Chicago Illinois 400 W Lake Street Suite 318 Roselle IL 60172 33...

Page 57: ...ange painted black Ring Black painted steel friction fit Chrome plated steel friction fit Window Glass Glass Dial Black figures on white background Black figures on white background Pointer Black alum...

Page 58: ...OUT PRIOR NOTICE AND WITHOUT INCURRING ANY OBLI GATION TO MAKE SUCH CHANGES AND MODIFICATIONS ON 7ATTS PRODUCTS PREVIOUSLY OR SUBSEQUENTLY SOLD 3ERIES AND 8 3ERIES 8 3ERIES 8 3ERIES OB AME ONTRACTOR O...

Page 59: ...and for reference only Certified drawings are available on request Vertical 3 8 1 2 3 4 1 1 1 4 1 1 2 1 4 3 8 1 2 3 4 1 1 1 4 1 1 2 1 3 4 2 1 8 2 3 8 2 15 16 3 1 16 1 1 8 1 3 8 1 5 8 1 7 8 2 5 16 2 1...

Page 60: ...thematically gives the relationship bet ween the rate of flow and the pressure drop The flow formula used was recommended by the Fluid Controls Institute INCHES HG VACUUM NOTE Capacities will vary sli...

Page 61: ...Engaged Length When piping in the vacuum breaker attention should be given to the engaged length E 1 The vacuum breaker should never be installed such that the screen is in the flow path In instances...

Page 62: ...TALLING DIRECT IMMERSION MODELS L6006B Install fitting in boiler tapping as follows 1 Be sure sealing washer is in place as shown in Fig 3 Make sure that spud of capsule compression fitting is screwed...

Page 63: ...To adjust models with adjustable differential rotate the wheel on the back of the snap switch until the desired reading is aligned with the V notch in the frame The wheel provides an adjustment from 5...

Page 64: ...e are covered in the manual supplied with the product All equipment must comply with local codes Ace Heating Solutions LLC 2701 S Harbor Blvd Santa Ana CA 92704 714 540 2230 Fax 714 540 2239 www acehe...

Reviews: