ACDC Blade Pro Installation Instructions Manual Download Page 3

Blade Pro Installation Instructions: He44 (0) 845 862 6400. 

3

INS211 Rev.2. 25.05.2018

Blade Pro: Guidelines & Ground Sleeve Installation

X

X

X

max. 30 min.

The sleeve must be fully supported from below and installed level.

Failure to level the product may impact the lit effect.

Make sure the ground sleeve is installed level with
the finished ground surface.

Blade Pro 300 = 2.2L / 0.58 US gal.
Blade Pro 600 = 4.3L/ 1.14 US gal.
Blade Pro 900 = 6.4L/ 1.69 US gal.
Blade Pro 1200 =  8.5 L/ 2.24 US gal. Drainage 
testing should be carried out prior to the 
installation of the luminaire.

This fitting is designed to be used with 
the provided ground sleeve for external 
recessed installation only. This product is
not to be installed under water.

Failing to ensure appropriate drainage
will void warranty.

X

X

Ensure proper drainage. A quantity of 
water the equivalent to the volume of the 
sleeve should drain completely in 30mins or 
less.

Reviews: