
Step 3: System Power-on
Connecting the Power
1. Insert the left power cable into the rear panel left AC power port.
2. Similarly, Insert the right power cable into the rear panel right AC
power port.
3. Plug both power cords into the power source (outlet).
4. Once all the components and cables have been connected, the
system can now be powered on using the Power On/Off Switch.
JBOD Operation
Follow the procedures below in the sequence shown.
Warning: Changing the sequence of the steps below may result in damage to this device.
1. Power on the JBOD.
2. Power on the RAID (controller).
3. Insert the HBA into the host (workstation) PCIe slot.
4. See Blue "System Ready" LED light on (See page7 for more details).
5. Power on the host.
6. Download and install HBA driver from the Accusys Web site.
7. Reboot host.
Caution:
Please power off the A12S2-SJ JBOD and unplug the power
cord before inserting or removing the power cord.
P11
Summary of Contents for ExaSAN A12S2-SJ 6Gb SAS JBOD
Page 2: ......
Page 5: ...Quick Start Guide Hardware Installation 1P3...
Page 14: ...Quick Start Guide P12...
Page 15: ...Software Installation and Configuration 2 Quick Start Guide P13...
Page 18: ...Quick Start Guide P16 12 Click Continue...
Page 21: ...P19 Technical Support 3 Quick Start Guide...
Page 23: ......
Page 24: ...42 33000 5040...