2.2

 

Regulator Startup 

Before the startup, check that the Regulator is installed correctly and all hose connections are in place 
with the hose clamps tightened. 

1.

 

With the pot pressure valve 

OFF

 attach the compressed air line to the pot. 

2.

 

Verify that the 

Abrasive Regulator

 is turned 

OFF

 

3.

 

Set the pot air regulator pressure to 40 psi. 

4.

 

Fill the pot with at least 500# of abrasive or until full. 

5.

 

Turn the pot pressure to 

ON

6.

 

With lines from the pot 

empty

 turn the regulator 

ON

  

The abrasive will initially feed from the pot unevenly until the air in the feed hose is replaced with 
abrasive.  When the line becomes stable (full of abrasive), there will be no flow unless the abrasive 
metering regulator is turned on.  For longer delivery lengths, the pot pressure may need to be increased 
to a maximum of 80 psi to accommodate for the additional length. 

NOTE

:  If the abrasive flows after turning the regulator OFF do not plug the top of the metering 

regulator top vent.  The top vent elbow is necessary for venting. 

Metering Regulator Flow Rate 

The abrasive flow rate coming from the Metering 
Regulator can be adjusted by turning the 

Metering 

Control Knob.

    Turning the knob will change the 

size of the hole in the metering aperture.  This 
abrasive flow rate can be adjusted during cutting. 
This adjustment knob is marked in one quarter 
graduations starting at 1 and going to 10. 
Any 

over travel

 in either direction beyond these 

markings is normal and will not effect the metering 
rate adjustment. 
The Abrasive Regulator also uses a gate controlled 
by an air cylinder to turn the abrasive flow on and 
off. 

 
Abrasive Settings 

The 

Control Knob Setting

 chart is based on 80HPA 

garnet and gives the abrasive flow rates that can be set 
by adjusting the knob settings.  Actual rates may vary 
slightly due to abrasive grit size and the feed pressure 
into the regulator acrylic tube.  

Suggested Set Points: 

9/30    Combination  

10/30 

 

 

13/40 

 

 

7 2/3 

15/40 

 

 

8 1/3 

Control Knob 
Setting 

Pounds per Minute 
(PPM) 

0.025 – 0.075 

0.1 – 0.125 – 0.15 

0.18 – 0.2 – 0.25 

0.3 – 0.35 – 0.4 

0.45 – 0.5 – 0.58 

0.65 – 0.72 – 0.8 

0.88 – 0.95 – 1.05 

1.15 – 1.25- -1.38 

1.5 – 1.62 – 1.7 

10 

1.8 –  1.92 – 2.2 

 

Summary of Contents for Abrasive Regulator II

Page 1: ...13096 Abrasive Regulator II ABRASIVE REGULATOR II ...

Page 2: ...gulator Installation 2 Location 2 Attaching the Regulator to the Machine 2 Connecting the Metering Regulator 3 Abrasive Delivery from the Pot to the Regulator 3 2 2 Regulator Startup 4 Metering Regulator Flow Rate 4 Moisture or Water 5 Disassembly and Reassembly 6 3 Drawings and Parts Lists 7 ...

Page 3: ...ct Information and Customer Technical Service At AccuStream your purchase is only the beginning of our commitment to help you succeed We believe that what happens after the sale is just as important as what happens before Customer Service Representatives are available to take your calls Monday through Friday 7 00 AM to 5 00 PM CST If you need service after hours AccuStream is also on call 24 hours...

Page 4: ...h to keep the regulator out of the spray back area from the cutting head and within reach for adjusting the abrasive flow rate Attaching the Regulator to the Machine 1 Remove the back mounting plate from the regulator Use the mounting plate to position and drill mounting holes on the machine NOTE The holes on the mounting plate are positioned 2 inches 50 8 mm on center from each other and counter ...

Page 5: ...f the regulator Abrasive Delivery from the Pot to the Regulator The hose from the pot to the metering regulator should have a minimum of elevation changes A maximum hose height of 10 feet from the floor is usually sufficient The hose should not be more than two feet above the top of the metering regulator to ensure even flow A 90 degree fitting should be used at the top of the Regulator Hose end c...

Page 6: ...metering regulator top vent The top vent elbow is necessary for venting Metering Regulator Flow Rate The abrasive flow rate coming from the Metering Regulator can be adjusted by turning the Metering Control Knob Turning the knob will change the size of the hole in the metering aperture This abrasive flow rate can be adjusted during cutting This adjustment knob is marked in one quarter graduations ...

Page 7: ... abrasive it should be discarded Verify that the air pressure regulator bowl on the pot is emptied of water Moisture or Water When the nozzle is plugged water will go up the feed hose to the regulator and discharge from the vent hole on the back of the Output Adapter If this occurs the Adapter will need to be cleared With the jet ON and the Regulator OFF plug the back VENT hole right This should v...

Page 8: ...ormally require maintenance In the event that this area does require disassembly the orientation of the parts during reassembly must be correct On the assembly drawing cut out right note the location and thickness of Sandwich plate and the Exit plate The 0 50 dimensions and plate thickness will determine the orientation and placement of both parts ...

Page 9: ...AccuStream Cutting Systems 7 13096 Abrasive Regulator II Manual 3 Drawings and Parts Lists 11484 ...

Page 10: ...AccuStream Cutting Systems 8 13096 Abrasive Regulator II Manual 4 Drawings and Parts Lists 13762 ...

Reviews: