Accurex Grease Grabber H2O XGH2O Installation, Operation And Maintenance Manual Download Page 13

13

Model XGH2O

Installing Enclosure Panels

Before installing the enclosure panels, make sure 
the hood is hung in position with all the ductwork 
attached, electrical connections and fire system 
connections completed.
1.  Position the end enclosure panels on the hood, 

and clamp into place with clamps provided or 
tack-weld the panels into place.

2.  Fasten the end enclosure panels to the wall; 

method depends on wall construction. (Fasteners 
are not provided).

 

If the hood is a double island, bolt the end 
enclosure panels together. (Fasteners are not 
provided).

3.   Position the front enclosure panel(s) on the hood, 

and bolt to the end enclosure panels with the 
5/16 in. bolts provided in the hardware package.

4.  Tack-weld or clamp the front enclosure panel(s) 

to the hood. If clamps are used, they must be 
positioned 4 in. (100 mm) from the ends, and in the 
center of the front enclosure panel.

5.   To allow for ease of cleaning, caulk the external 

seams with NSF Approved silicone caulk 
(GE SCS1000, or its equivalent). The caulk is not 
provided.

Note: 

 Installation instructions may not be applicable 

for concrete ceilings.

Installing End Skirts

1.  After the hood is hung in position, slide the 

hemmed form on top of the end skirt onto the end 
panels of the hood.

2.  Drill a hole in the hood end panel to line up with 

the hole in the end skirt. Attach the end skirt with  
a 1/4 in. bolt and cap nut to the inside of the hood, 
or tack-weld the end skirt to the hood.

3.  Position the end skirt against the wall and attach. 

The method depends on the wall construction. 
(Fasteners for this are not provided).

4.  Caulk the internal joint formed by the end skirt and 

the hood end panel with NSF Approved silicone 
caulk (GE SCS1000 or its equivalent). The caulk is 
not provided.

5.  To allow for ease in cleaning, also caulk all the 

external seams.

End Enclosure

Panel

Front Enclosure Panel

End Enclosure
Panel

Attach to wall.

Fasteners by others

 

Clamp panels to hood standing seam with hardware.

Supplied by mfg.

Bolt panels together with 5/16-inch bolts.

Supplied by mfg.

HOO

D TO

P

HOO

D B

ACK

HOO

D FR

ONT

 PAN

EL

Attach to wall

Fasteners by others

 

Full End Skirt

Hemmed Edge

Exploded
view
below

Holes drilled by installer

1/4-inch bolt and cap nut

Supplied by mfg.

Exploded View

Summary of Contents for Grease Grabber H2O XGH2O

Page 1: ...prevent accidental power up CAUTION When servicing the unit motor may be hot enough to cause pain or injury Allow motor to cool before servicing Installation Operation and Maintenance Manual Please re...

Page 2: ...each item have been received If any items are missing report shortages to your local representative to arrange for obtaining missing parts Sometimes it is not possible that all items for the unit be s...

Page 3: ...ically engaged to run at the same time each day through a programmable timer Grease Grabber H2O System Function Table of Contents Grease Grabber H2O System Function 3 Cleaning Cycle Manual and Automat...

Page 4: ...r and detergent will fill the hood reservoir The soapy water will then be cycled through the hood by the attached recirculation pump cleaning both the filter banks and the exhaust plenum area on a tim...

Page 5: ...ILL DETERGENT After pressing CLEAN HOOD Fans will automatically stop 472617 In case of emergency the wash cycle can be stopped by pressing CLEAN HOOD CLEAN HOOD FAN ON OFF SYSTEM FAULT FILL DETERGENT...

Page 6: ...on process 1 2 3 Profile of Hood Profile of Hood Profile of Hood Profile of Hood Remove side back and top lumber Remove 3 inch lag screws Holding the front lifting skid in place and position the skid...

Page 7: ...r must be contacted at this time After the fire system has been installed mount the enclosures then the supply plenums If an Horizontal Supply Plenum is provided it should be installed before the encl...

Page 8: ...u clips and bolts Caulk this joint with NSF Approved silicone caulk GE SCS1000 or its equivalent The caulk is not provided NOTE Before hanging the hoods please verify the hood marks to make sure the...

Page 9: ...ion instructions now Supply Supply ductwork where applicable should be connected to the hood in a manner approved by the local code authorities For proper installation of duct collars when they are sh...

Page 10: ...in mm in mm ft m Back Supply 35 0 15 878 6 152 4 Variable Variable 3 to 16 91 to 4 88 145 cfm ft 246 36 m3 hr Air Curtain Supply 14 inch 9 5 4 31 14 355 6 10 254 3 to 16 91 to 4 88 110 cfm ft 186 89 m...

Page 11: ...STED LOCATION ABOVE CUT 1 4 in X 24 in OPENING AT CENTERED ON WIDTH OF THE SUPPLY IF MODULE 6 ft STEP 1 4 in TO 6 in FASTEN WITH S PLACE THE DU L MODULE LENGTH L 2 L 2 L 2 L MODULE LENGTH L 4 L 4 STEP...

Page 12: ...UPPLY IF IT WILL NOT INTERFERE 2 BEFORE THE HOOD IS HUNG THE BACKSUPPLY MUST BE SECURED INSTRUCTIONS AND THE FOLLOWING PROPERLY AS DESCRIBED IN STEP 3 in STEP 4 5 Connect the remaining ductwork for th...

Page 13: ...provided Note Installation instructions may not be applicable for concrete ceilings Installing End Skirts 1 After the hood is hung in position slide the hemmed form on top of the end skirt onto the e...

Page 14: ...PIECES PANELS UP TO 48 IN 1219 2 MM WIDE SHIP IN ONE PIECE OVER 48 IN 1219 2 MM IN MULTIPLE PIECES Length 1 inch 25 4 mm Heigth Length Height 1 After the hood is hung in position slide the flat flang...

Page 15: ...nnection Exhaust duct connection is to be a continuous liquid tight weld to hood Supply Duct Connection Supply duct connection to be tack welded with 1 to 2 inch tacks or sheet metal screws at 3 to 6...

Page 16: ...detergent is non caustic and biodegradable waste water from the hood can be drained in any typical grease trap A One inch unions B Detergent tank C Mounting plate D Isolators qty of four E Detergent...

Page 17: ...facturer for use in the wash system Use Formula G 510 full strength This product is biodegradable non caustic and safe for kitchen staff to use If G 510 detergent is not used the cleanliness of the ex...

Page 18: ...ive order of time for example 8 00 pm ON 9 00 pm ON 10 00 pm ON Not 8 00 pm ON 10 00 pm ON 9 00 pm ON b Do not overlap event times for example 8 00 pm ON 12 00 pm OFF and 9 00 pm ON 11 00 pm OFF c Set...

Page 19: ...se valve until water mist is no longer felt above equipment Once the valve is set it will not need to be moved again Verify the Grease Grabber H2O sequence of operation see the diagram of wash sequenc...

Page 20: ...pump OFF Spray for 5 minutes Spray for 5 minutes 20 minute dry time Wash rinse dry complete No Temperature Interlock Exhaust Mode in Fire STOP Exhaust Mode in Fire RUN No Yes Shut OFF exhaust fan s T...

Page 21: ...x 4 846 x Average inlet slot velocity x 2 47 144 Average Velocity Sum of Velocity Readings Number of Readings Hood Length 48 to 72 inches 72 to 120 inches 120 to 192 inches Minimum Number of Test Loca...

Page 22: ...MICROSWITCH IN NORMAL INSTALLATION THE YELLOW WIRE IS TO BE USED ONLY FOR EXTINGUISHER ALARM LIGHTS CIRCUITS ETC L1 L2 PUSHBUTTON SWITCH 120V 60HZ K1 Ka K1b CURRENT DRAW MAX 8A RESISTIVE 8A INDUCTIVE...

Page 23: ...WITH ANSUL ANSUL SNAP ACTION SWITCH BLACK RED NEUTRAL HOT 1 L2 L NOTE ANSUL file name Typicalwiringschematicelectricequipmentshutdowndetail ai File received on August 4 2010 TEMPERATURE RATING 110V 6...

Page 24: ...K RD 12 GA 12 GA 12 GA 18 GA 18 GA 18 GA 18 GA BK BK BK BK N WHT BL BL PR PR PR PR PR BR PR PR PR 18 GA YW YW YW 12 GA 18 GA PR PR R6 120 VAC Wash Timer Relay A1 A2 T1 T2 Timer Contact BK RD BK N WHT...

Page 25: ...ing the filters Ensure no gaps are between filters after installation If any filter appears damaged consult factory for replacement Floats The floats need to be inspected two weeks after start up and...

Page 26: ...ks water leaking through the access panels when filling Ensure access panels are securely in place If leak persists partially close inlet water ball valve by others upstream of fill solenoid to reduce...

Page 27: ...guide on page 26 Grease Grabber H2O Start Up Checklist Check boxes when item has been verified and gone over with customer Hook Up o Electrical Connected 120V 1 30A to terminals L1 and N for wash cont...

Page 28: ..._______________________________ Date___________________ Time______________ AM PM Notes ___________________________________________ _________________________________________________ ___________________...

Reviews: