Chapter 4: Installation Method
www.accuenergy.com
V: 1.0 Revised: Sept. 2019
6
4. Installation Method
The L-WEB module is linked to the Acuvim L series meter by a communication plug. Oth-
er extended modules such as the IO modules can be linked to the Acuvim L series meter
through the L-WEB module.
1. Remove cover from the back of the Acuvim L series meter which will expose the sock-
et.
2. Insert the installation clips to the grooves in the Acuvim L series meter and then press
the L-WEB module lightly to establish a linking between meter and module.
3. Tighten the installation screws.
NOTE: Installation with power to the meter is forbidden.
NOTE: If using extended I/O modules with L-WEB module, ensure that the L-WEB module is
attached to the meter first followed by the I/O modules. If the L-WEB module is not con-
nected first it will not be able to communicate with the Acuvim L meter.