- Instruction Manual for ESS R050100-
24
(4)
Fit the two connectors together until the connection audibly locks into place.Check to make
sure the connection is securely locked.
(5)
Connect Battery BMS CAN cable to the right position onto the inverter.
Note: Please refer to section 3.4.2 for connection details of battery BMS and inverter CAN
communication line.