C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 37 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
ACKAGE
C
ONTENTS
◆
Gigabit Ethernet Switch (ES4528V)
◆
Four adhesive foot pads
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Power Cord—either US, Continental Europe or UK
◆
RS-232 console cable
◆
This Installation Guide
◆
Management Guide CD
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Summary of Contents for Edge-Core ES4528V
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14 ...
Page 20: ...TABLES 20 ...
Page 22: ...FIGURES 22 ...
Page 28: ...CHAPTER 1 Introduction Description of Hardware 28 ...
Page 70: ...GLOSSARY 70 ...
Page 73: ......