Accton Technology CheetahSwitch Workgroup-3726M Quick Installation Manual Download Page 22

Quick Installation Guide

14

Power and Cooling Problems

If the power indicator does not turn on when the power cord is plugged in, you may 
have a problem with the power outlet, power cord, or internal power supply as 
explained in the previous section. However, if the unit powers off after running for a 
while, check for loose power connections, power losses or surges at the power outlet, 
and verify that the fans on the right side of the unit are unobstructed and running 
prior to shutdown. If you still cannot isolate the problem, then the internal power 
supply may be defective. In this case, contact your Accton distributor for assistance.

Installation

Verify that all system components have been properly installed. If one or more 
components appear to be malfunctioning (e.g., the power cord or network cabling), 
test them in an alternate environment where you are sure that all the other 
components are functioning properly.

Symptom

Cause

Solution

Power indicator

 

does not light up 

after power on.

Power outlet, power 

cord, or internal power 

supply may be 

defective.

Check the power outlet by plugging in another device 

that is functioning properly. Check the power cord with 

another device. If these measures fail to resolve the 

problem, contact your Accton distributor.

Link indicator

 

does not light up 

after making a 

connection.

Network interface (e.g., 

a network adapter card 

on the attached 

device), network cable, 

or switch port may be 

defective.

Verify that the switch and attached device are 

powered on. Be sure the cable is plugged into both the 

switch and corresponding device. Verify that the 

proper cable type is used and its length does not 

exceed specified limits. Check the adapter on the 

attached device and cable connections for possible 

defects. Replace the defective adapter or cable if 

necessary.

Mgmt indicator

 

does not light up 

after power on.

A Management Module 

is not installed 

correctly, or may have 

failed.

Check that the Management Module is correctly 

installed in the upper slot on the switch rear panel (at 

least one Management Module is required in a switch 

stack). Test the Management Module by installing it in 

another switch unit. If these measures fail to resolve 

the problem, contact your Accton distributor.

Module 1/2 Status 

indicator

 does not 

light up after power 

on.

A optional module is 

not installed correctly, 

or may have failed.

Check that the module is correctly installed in one of 

the two lower slots on the switch rear panel. Test the 

module by installing it in another switch unit. If these 

measures fail to resolve the problem, contact your 

Accton distributor.

Switch ID LCD 

does not display a 

stable unit number.

The switch stack has 

not initiated properly.

Reset the stack by powering off each switch unit in the 

stack and then powering them back on. Check all 

Stacking Modules are installed correctly in the 

lower-left slot on the rear panel of each switch. Check 

that all stacking cables are connected correctly. If 

these measures fail to resolve the problem, contact 

your Accton distributor.

Summary of Contents for CheetahSwitch Workgroup-3726M

Page 1: ...CheetahSwitch Workgroup 3726M Quick Installation Guide...

Page 2: ......

Page 3: ...Quick Installation Guide CheetahSwitch Workgroup 3726M Intelligent Stackable Fast Ethernet Switch with 24 10BASE T 100BASE TX RJ 45 Ports and Optional Media Expansion and Stack Modules...

Page 4: ...Irvine CA 92618 Phone Numbers Sales 800 926 9288 Support 888 398 4101 or 949 707 4847 RMA 800 762 4968 Fax 949 707 2460 Copyright 2002 by Accton Technology Corporation All rights reserved No part of t...

Page 5: ...n product A list of discontinued products is attached with the firmware configuration information or memory data of Customer contained in stored on or integrated with any products returned to Accton p...

Page 6: ...OR IN CONNECTION WITH THE SALE INSTALLATION MAINTENANCE USE PERFORMANCE FAILURE OR INTERRUPTION OF ITS PRODUCTS EVEN IF ACCTON OR ITS AUTHORIZED RESELLER HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DA...

Page 7: ...ort 7 Powering On the Switch 8 Verifying Port Status 9 Verifying System Operation 9 Applications 10 Product Specifications 11 Base Unit 11 Physical Characteristics 11 Switching Criteria 12 Traffic Con...

Page 8: ...on of Conformance for EMI and Safety EEC 17 Safety Compliance 18 Warning Fiber Optic Port Safety 18 Avertissment Ports pour fibres optiques s curit sur le plan optique 18 Warnhinweis Faseroptikanschl...

Page 9: ...high speed server connection The lower left slot is for either an optional media expansion module or Stacking Module Up to four switch units can be stacked together using Stacking Modules When the Ma...

Page 10: ...dule while the lower right slot can be used for a media expansion module Note that the media expansion modules include a Fast Ethernet fiber optic module with two 100BASE FX SC type ports or a one por...

Page 11: ...ce If you intend to mount the switch in a rack make sure you have all the necessary mounting screws brackets bolts and nuts and the right tools Check if network cables and connectors needed for instal...

Page 12: ...upper slot by removing the two screws with a flat head screwdriver 3 Before opening the package that contains the module touch the bag to the switch casing to discharge any potential static electrici...

Page 13: ...he slot along the guide rails ensuring that it firmly engages with the connector 6 If you are sure the module is properly mated with the connector tighten the retainer screws to secure the module in t...

Page 14: ...r standard 10 Mbps Ethernet connections or 100 ohm Category 5 cable for 100 Mbps Fast Ethernet connections 3 Connect one end of the cable to the RJ 45 port of the network interface card and the other...

Page 15: ...ort When connecting fiber cable to a Gigabit fiber optic port on the switch be sure you use an SC type connector Follow the steps below Warning This switch uses lasers to transmit signals over fiber o...

Page 16: ...to any input voltage within the range marked on the rear panel 3 The switch performs a self diagnostic test upon power on Note that this test takes several minutes to complete Note The unit supports a...

Page 17: ...tus LEDs on the switch panel should be on indicating that the modules are installed and operating correctly Verify that all attached devices have a valid connection The switch monitors the link status...

Page 18: ...Functions This switch provides fully transparent bridging functions It automatically learns node addresses that are subsequently used to filter and forward all traffic based on the destination address...

Page 19: ...24 RJ 45 100BASE TX ports Indicator Panel System Power RDP Mgmt Ports link speed disabled partitioned activity duplex flow control Dimensions 440 x 285 x 64 mm 17 37 x 11 22 x 2 53 in Weight 4 5 kg 9...

Page 20: ...old Modules Management Module AC ES3726M AGENT System Configuration Configuration via console connection to serial port or via Telnet Web based management via HTTP protocol to access embedded manageme...

Page 21: ...nformance IEEE 802 3z Communication Rate 1000 Mbps Communication Mode Full or half duplex Output Power Minimum 9 5 dBm Maximum 3 dBm Receiver Sensitivity Minimum 20 dBm Saturation 3 dBm Power Budget 1...

Page 22: ...switch port may be defective Verify that the switch and attached device are powered on Be sure the cable is plugged into both the switch and corresponding device Verify that the proper cable type is u...

Page 23: ...ters 328 feet Straight Through Wiring If the twisted pair cable is to join two ports and only one of the ports has an internal crossover MDI X the two pairs of wires must be straight through Crossover...

Page 24: ...d to take whatever measures are required to correct the interference You may use unshielded twisted pair UTP for RJ 45 connections Category 3 or greater for 10Mbps connections and Category 5 for 100Mb...

Page 25: ...nd flicker in low voltage supply system according to EN 61000 3 3 1995 Immunity Product family standard according to EN 55024 1998 Electrostatic Discharge according to EN 61000 4 2 1995 Contact Discha...

Page 26: ...sse Optische Sicherheit Niemals ein bertragungslaser betrachten w hrend dieses eingeschaltet ist Niemals direkt auf den Faser TX Anschlu und auf die Faserkabelenden schauen w hrend diese eingeschalte...

Page 27: ...Zeitraum nicht benutzt sollten Sie es vom Stromnetz trennen Somit wird im Falle einer berspannung eine Besch digung vermieden 12 Durch die L ftungs ffnungen d rfen niemals Gegenst nde oder Fl ssigkeit...

Page 28: ...Module with 2 100BASE FX SC type Ports EM4582 SX SC Media Module with 1 1000BASE SX SC type Port EM4582 LX SC Media Module with 1 1000BASE LX SC type Port EM3580 STACK Stacking Module kit including 30...

Page 29: ......

Page 30: ...AC ES3726M E012002 R01 F2 476 150200008100A...

Reviews: