AUTO ADJUSTMENT
The message “P0” appears on the display and the board is ready
to adjust the O
2
value at minimum power.
With this condition:
“ ” it is used to switch between the Power / O2 menu (for the
cycle time).
“ ” o “ ” they are used to increase / decrease the O2 value
or change the power of the system (if the flame symbol flashes).
Press the key for the cycle time “ ” to activate the O
2
menu.
By pressing the keys “ ” or “ ” it will be possible to modify the
current value of RFlame set and vary the O
2
.
Press the button “ ” (for the cycle time) to confirm the setting
at “P0” and “ ” (for the cycle time) to pass to the second level
to be adjusted “P1”.
Proceed with the CO2 calibration following the steps taken to
adjust the minimum.
Press the button “ ” to confirm and “ ” to pass to the
adjustment of the maximum “P2”.
Adjust the value as per the table. Confirm with the key “ ”.
Press the button “
MODE
” (without waiting for the cycle time) to
end the procedure and store the adjustments made.
MANU. ADJUSTMENT
The message “P0” and the board appear on the display. ready to
adjust the CO2 value at minimum power.
With this condition: “ ” it is used to switch between the Power
/ CO2 menu (for the cycle time).
“ ” or “ ” they are used to increase / decrease the CO2 value
or change the power of the system (if the flame symbol flashes).
Press the key for the cycle time “ ” to activate the CO2 menu.
By pressing the keys “ ” or “ ” it will be possible to modify the
current RFlame set value and correct the CO2.
Press the button “ ” (for the cycle time) to confirm the setting
at “P0” and “ ” (for the cycle time) to pass to the second level
to be adjusted “P1”.
Proceed with the CO2 calibration following the steps taken to
adjust the minimum.
Press the button “ ” to confirm and “ ” to pass to the
adjustment of the maximum “P2”.
Adjust the value as per the table and confirm with the key “ ”.
Press the button “
MODE
” (without waiting for the cycle time) to
end the procedure and store the adjustments made.
It is possible to exit the adjustment function at any time by
pressing the key for the cycle time “
MODE
”.
Finally, set P08 to 70% and P09 to 80%.
A
4.7.4 BOILER TESTING
Each boiler is accompanied by a certificate of inspection.
The completion of the inspection certificate by an Authorized
Service Center allows you to enjoy the benefits offered
by the insurance formula provided by the manufacturer as
specified in the inspection certificate itself.
4.7.5. PRELIMINARY CHECKS
Before testing the boiler, it is advisable to check:
- the smoke evacuation duct and the terminal part are installed
in accordance with the instructions: with the boiler on no
leakage of products of the combustion from no gasket;
- the boiler power supply voltage is 230 V - 50 Hz;
- the system is properly filled with water (pressure al
manometer 1-1.3 bar);
- any shut-off cocks on the pipes of the plant are open;
- the mains gas corresponds to the boiler calibration one:
otherwise, proceed with the conversion of the boiler to the use
of available gas: this operation it must be performed by
qualified technical personnel;
- the fuel supply cock is open;
- there are no combustible gas leaks;
- the main electrical switch upstream of the boiler is inserted;
- the 3 bar safety valve is not blocked;
- there are no water leaks;
- the condensate drain siphon, mounted in the boiler, drain the
condensate properly and is not blocked.
If the boiler is not installed in accordance with the laws and
regulations in force, notify the system manager and do not
test the boiler.
4.7.6. MAINTENANCE
Maintenance (and repair) operations must necessarily be
carried out by qualified personnel.
The manufacturer advises its customers to contact the network
of its Authorized Service Centers for maintenance and repair
operations, which are trained to perform the above operations in
the best possible way.
Proper maintenance of the boiler allows it to work in the best
conditions, respecting the environment and in complete safety
for people, animals and things.
Maintenance operations must be performed at least once a year.
Before proceeding with any maintenance operation that
involves the replacement of components and / or
internal cleaning of the boiler disconnect the appliance from
the power supply.
Maintenance operations include checking and cleaning
operations as specified below:
Control operations:
- general check of the integrity of the boiler;
- check the tightness of the gas circuit of the boiler and of the
gas supply network to the boiler;
- control of the boiler supply pressure;
- control of boiler ignition;
- control of the boiler combustion parameters by means of
smoke analysis;
- checking the integrity, the good state of conservation e the
tightness of the flue gas exhaust pipes;
- check the functioning of the combustion fan;
- check the integrity of the boiler safety devices in general;
- control of the absence of water leaks and the absence of
oxidation of the boiler fittings;
- check the efficiency of the safety valve
VALUES OF CO
2
IN FUMES
DIAMETER DIAPHRAGMS
Methane / LPG mm)
Fuel
20 kW Methane
20 kW LPG
CO
2
value min/max (%)
9,3 / 9,8
10,4 / 10,7
Acceptable range (%)
Summary of Contents for HR 3.0