Accorroni GHIBLI 4-5-6 ELITE Technical Information Download Page 19

page 17

bendable type in stainless steel. Connect the
ducts to the doubling device using metal clamps
and tighten them to ensure a good seal on the
fitting. With the doubling device connected in
this manner, place it in the housing and block it
into position using cement mortar.

Make sure to respect the position indicated
in 

fig. 17

, so that only the circular fitting

projects from the finished wall, while the
interior of the doubling device is flush with
that wall.

WARNING! The seal of the connector between
the doubling device and the appliance is
created by a special gasket (fig. 18). Make
sure that the wall on which the air heater is
installed is perfectly flat, so that the
subsequent attachment of the appliance does
not change the coupling.

Assemble the ducts in the chases up to the
relative external terminal, carefully checking any
joints (if a rigid tube is used make sure that the
special unions and gaskets are mounted
correctly).

WARNING! It is recommended to insulate the
duct by using insulating material that is
suitable for the temperatures generated (for
example, glass fibre mattress for temperatures
up to 200°C), to prevent condensation from
forming inside the duct and/or to avoid cracks
in the plaster due to the high temperature. At
the end of the previous operations close the
chases, making sure that the cement mortar
completely covers the ducts and that there
are no empty spaces.

Place the previously used template on the wall,
centering the position of the intake/exhaust fitting
onto the corresponding centre of the walled
doubling device, and mark the position of the
three holes to attach the appliance. The holes
should be drilled using an Ø 8 mm bit for
expansion bolts.

To adapt the intake/exhaust fitting of the
appliance to the coupling with the doubling device
connector, do the following operations:

a)

remove the three screws inserted in the fitting
on the appliance (they will not be used again)

b)

mount the aluminium flange Ø 92 mm,
inserting the ring gasket and attaching it on
the appliance fitting using the three screws
supplied with the kit. Check that the ring
gasket fits correctly into its housing 

(fig. 18)

.

4.4.4 Appliance wall mounting

a

)

Appliance with standard supply -
Installation Type C

12

Lift the appliance and, putting the intake/exhaust
duct at the beginning of the hole, push it toward
the wall until contact is made.

Adjust the position of the appliance and attach
it with the expansion screws that were
previously inserted into the wall. On the
exterior, check  that the intake/exhaust duct
ends flush with the wall.

Insert the external wind protection terminal on
the duct and mark the position of the hole for
the expansion bolt to be drilled in the wall 

(fig.

15)

. After drilling the hole, re-insert the terminal

and attach it permanently, checking its stability.

b)Appliance with accessories for separate

intake and exhaust ducts -  Installation
Type C

52

Lift the air heater and slowly bring it closer to
the wall until coupling the two intake/exhaust
connectors located on the doubling device
and on the appliance.
Making sure not to change the coupling
described above, adjust the position of the
appliance and attach it using the expansion
screws that were previously inserted into
the wall.

In both cases described above, it is
recommended to use two persons to lift and
position the air heater to avoid any possible
damage to the wall or the appliance.

4.4.5 Gas connection

Mount the gas on-off valve supplied with the
appliance using the special gasket. Connect the
gas supply line to the valve which is equipped
with a female threaded attachment G 3/8".

WARNING!: The valve must be located in a
position that can be easily accessed by the
user.

Check the seal on the gas piping and make sure
that it was created in conformity with the current
standards regarding gas installations.

4.4.6 Electrical connections

Ensure that a single-phase, 230 V ~ 50 Hz
electric power supply is available.

The appliance must be properly insolated by
means of an omnipolar circuit-breaker with

Summary of Contents for GHIBLI 4-5-6 ELITE

Page 1: ...Technical Information GHIBLI 4 5 6 ELITE Gas fired convective air heaters GHIBLI 4 5 6 ELITE Cod 25619502IT Rev 0 20 03 2013...

Page 2: ......

Page 3: ...l data styling characteristics components and accessories detailed in this manual are not binding A2B ACCORRONI E G S r l reserves the right to make changes at any time that are considered necessary t...

Page 4: ...6 1 Switching from gas in the second group to gas in the third group 20 6 2 Switching from gas in the third group to gas in the second group 20 7 OPERATING DEFECTS 21 7 1 Preliminary tests 21 7 2 Pos...

Page 5: ...stduct 16 16 Solution with duct doubling device 16 17 Location of the doubling device in the wall 16 18 Coupling with the doubling device 16 19 Power supply cable connection 18 20 Connecting more than...

Page 6: ...aching the CE marking shown below also guarantees that the appliance conforms with EEC directive 2006 95 Lowvoltage throughtheharmonisedstandard EN 60335 1 and EEC directive 2004 108 Electromagnetic c...

Page 7: ...e the gas unit the room thermostat and related wiring 1 5 PACKAGE CONTENTS Theairheaterisshippedwithcardboardpacking withtwopolystyrenefoamprotectionshellswhich also contain the intake and exhaust duc...

Page 8: ...page 6 1 8 DIMENSIONI E INGOMBRI A B C Aspir Scar Gas Ghibli 4 717 267 534 65 G 3 8 Ghibli 5 6 807 366 624 65 G 3 8 Fig 1...

Page 9: ...V 50 Hz 8 7 6 5 4 3 2 1 18 19 M3 Al T 1 9 WIRING DIAGRAM Ghibli Model 5 Fig 3 Al External auxiliaries supply Ac Control equipment Co Fan speed switch Ea Ignition electrode Er Flame detection electrode...

Page 10: ...ater via a switch with contact opening of at least 3 mm Observe the correct phase neutralpolarity when connecting the single phase 230 V 50 Hz power supply 1 10 TECHNICAL DATA TABLE Units Ghibli 4 Ghi...

Page 11: ...page 9 1 11 EXPLODED VIEW Model Ghibli 4 Fig 5...

Page 12: ...page 10 1 11 EXPLODED VIEW Models Ghibli 5 and 6 Fig 6...

Page 13: ...lite Components missing in the design 45610038 Bronze friction bearing 45960036 Kit of gas valve connection Legend of components Ghibli 5 and 6 see fig 6 Pos Code description 01 45660001 Casing Ghibli...

Page 14: ...r The die cast aluminium casing is equipped with 3 8 RP threaded gas inlet and outlet connections and two inlet and outlet pressure test points The gas valve is also equipped with an inlet filter fig...

Page 15: ...cted area 3 4 DATA CHECK Check that the heater and its technical characteristics match what is indicated by the drawings or other documents The type of gas for which the heater has been designed and t...

Page 16: ...ons constitute the definition of type according to the current standards Type C12 standard supply The combustion circuit is hermetically sealed with respect to the environment in which the air heater...

Page 17: ...t fig 14 4 4 INSTALLATION OPERATIONS Set up the gas and electricity supply lines based on the installation design 4 4 1 Air heater wall mounting preparations appliance with standard supply Installatio...

Page 18: ...xhaust ducts Installation Type C52 Unlike the previous solution to mount the duct doubling device a recessed housing must be created in the wall and possibly some chases to indicate the duct layout fi...

Page 19: ...used again b mount the aluminium flange 92 mm inserting the ring gasket and attaching it on the appliance fitting using the three screws supplied with the kit Check that the ring gasket fits correctly...

Page 20: ...terminal board of the appliances after having removed the existing bridge 5 START UP WARNING The appliance initial start up operations and tests must be performed by skilled technical personnel 5 1 TE...

Page 21: ...he safety thermostat Then repeat the start up operation to observe and check that the burner has ignited correctly and that the flame is stable 5 3 USEFUL INFORMATION It is recommended that the user b...

Page 22: ...uge tube into the upstream pressure inlet on the burner fig 22 after having backed off the closing screw a few turns h start the air heater according to what is indicated in point 5 2 Check that the s...

Page 23: ...external terminal of the combustion air intake and combustion product exhaust duct is not obstructed 7 2 POSSIBLE DEFECTS The following is a list of possible defects along with their probable causes T...

Page 24: ...electrode electric connection has been interrupted Check the electrode connection to the control equipment If the cable or ceramic insulation is damaged replace the electrode in accordance with the po...

Page 25: ...ch the metal support block of the coils and remove it from the housing Pull out the coil s from the unit and replace them with new ones Replace the metal support block in the correct position and tigh...

Page 26: ...g the 6 screws that were previously removed 8 7 FLUE EXHAUST FAN Disconnect the motor electrical connection and loosen the three scroll fastening screws Gently remove the motor fan unit and respecting...

Page 27: ...Replace the burner support plate making sure that the relative gasket is in the correct position Attach the plate using the 6 screws that were previously removed Check that the external intake exhaust...

Page 28: ...ed led will turn off If the lockoutconditioncontinues thisgenerally means that there is a fault or an operating defect Therefore it is recommended to contact a Technical Service Centre The exchanger h...

Page 29: ...heck that the external terminal of the intake exhaust duct is not obstructed or that the relative material has deteriorated b clean the external parts of the air heater simply by using a damp cloth an...

Page 30: ...page 28 NOTE...

Page 31: ......

Page 32: ...A2B ACCORRONI E G S r l Via d Ancona 37 60027 Osimo An Tel 071 723991 Fax 071 7133153 Web Site www accorroni it E mail a2b accorroni it...

Reviews: