
4
MONTANA INSTALL ATION MANUAL
PREPARATION OF SITE
1
Carefully remove all packaging and inspect bath
and panels thoroughly�
NOTE
Do not use sharp knives or instruments
to remove packaging around the finished
surface areas of the bath.
2
Check all component parts are present before
proceeding to remove any existing facilities,
this can be cross checked against the parts
list supplied�
3
Remove any existing equipment and materials
as necessary to prepare the site� Check that
the site is clean and free of debris�
4
Prepare the floor area and ensure it is
FLAT,
LEVEL AND STRUCTURALLY SOUND
�
Check walls are square�
5
You may want to remove the door or seat
to make is easier to install�
The bath door can be removed by simply lifting
carefully� Do not unscrew the hinges from either
the door or bath�
To remove the seat, the bath will need to be
plugged in and handset fitted to do so, see
PAGES 10
and 11
for guidance�
Use the handset to move the seat to its halfway
position, carefully push in the two rear chrome
buttons and lift the seat off starting at the head
end of the bath� See
FIGS. 1 and 2
�
This unit is heavy – minimum of two
people are required to move it. Please
ensure the bath is carried only by the
frame or flange. Please read through
carefully before commencing any work.
KG
FIG. 1
FIG. 2