background image

LeadingLEDApplications

CR Series 

UserManual

ETL

R

FCC

CCC

TUV-CE

16:9HD&4K

pixel-to-pixel

resolution

CrystalView

technology

Powerand

Receivingcard

redundancy

SimpleRear

Maintenance

Summary of Contents for CR Series

Page 1: ...Leading LED Applications CR Series User Manual ETL R FCC CCC TUV CE 16 9 HD 4K pixel to pixel resolution CrystalView technology Power and Receiving card redundancy Simple Rear Maintenance ...

Page 2: ...ations 1 2 1Product Parameter 1 2 2 Cabinet Dimension Drawing 1 2 3 Module Dimension Drawing 08 2 1 Cabinet Introduction 08 10 2 2 Product Structure Electronic Components Details 2 Product Components 11 12 3 Product Installation 13 14 15 16 17 17 17 4 Product Cabling 4 1 Power Cabling 4 2 Data Cabling 5 Maintenance 5 1 Preparation Tools 5 2 Maintenance 17 5 3 Test for Short Circuit ...

Page 3: ...e or before disassembling or installing the product The AC power used in this product must comply with local building and electrical codes and should be equipped with overload and ground fault protection The main power switch should be installed at a location near the product and should be clearly visible and easily reached This way in case of any failure the power can be promptly disconnected Bef...

Page 4: ...rature is over 55 Beware of Injury Warning Wear a helmet to avoid injury Ensure any structures used to support fix and connect the equipment can withstand at least 10 times the weight of all the equipment When stacking products please hold products firmly to prevent tipping or falling Ensure all components and steel frames are securely installed When installing repairing or moving the product ensu...

Page 5: ...mm precise cabinet dimension is 609 92mmx343 08mm Each cabinet features a 27 5 inches diagonal with a 16 9 ratio a 2 2 cabinet layout will make a perfect seamless 55 inch display which can be used to replace a traditional LCD video wall with bezels This product is primarily used in government army large scale enterprise control room command center conference room and so on 1 Product Introduction ...

Page 6: ...ingle receiving card system is also available highly advanced designs of circuit layout and heat dissipation electromagnetic compatibility and protection high performance power long service life Total Plug wireless technology Internal wireless design hot swappable module design pluggable power supply and receiving card Sequence and Calibration Technology set up sequence for installation and debugg...

Page 7: ...ensions WxH mm 152 5 171 5 152 5 171 5 152 5 171 5 152 5 171 5 Optoelectronic Parameter Brightness nit 800 650 600 600 Refresh Rate Hz 1 920 1 920 1 920 1 920 Contrast RaƟo 4 500 1 4 000 1 3 000 1 3 000 1 Color Temperature K 6 500 6 500 6 500 6 500 Viewing Angle H V 160 140 160 140 160 140 160 140 Driving Type 1 20 1 24 1 26 1 27 AC OperaƟng Voltage V 100 240 100 240 100 240 100 240 Power ConsumpƟ...

Page 8: ...Leading LED Applications CR Series User Manual 1 2 2 Cabinet Dimension Drawing 1 2 3 Module Dimension Drawing 07 NN NN NN NN NN ...

Page 9: ...ifications Screw Power output Test button and indicator light Power input Dowel pin DATA2 Right handle Left handle Screw holes DATA1 Handle 2 2 1 Data cable for vertical connections in between the cabinets 0 5m long 8 1 1 8 2 2 2 Data cable for horizontal connections in between the cabinets 0 8m long 8 1 1 8 ...

Page 10: ...gth is 10m 2 2 7 Standard package carton box for each cabinet packaged size 710x440x150mm L W H weight about 7kg 2 2 4 Power cable for horizontal connection length is 0 8m 2 2 5 Main data cable from screen to the processor length is 30m Notes Main Power cable is suitable for plugs or terminals MEAS 710 440 150mm G W KG QTY PCS N W KG ...

Page 11: ...l length threaded bolt Structure connector 105mm 88mm 16mm Threaded hole for adjusting Z Axis Vertical connector for the cabinets Connector between cabinets Horizontal connector for the cabinets Threaded hole for fixing cabinet Module screw hole Hole for fixing structure connector 41mm 105mm 88mm 49 5mm ...

Page 12: ...of the steel frame then install cabinets layer by layer to top You need to use cabinet connector plates structure connectors and screws M8 to mount the panels on to the frames Notes You need to keep the space of 42mm between steel frame and cabinets connectors in case there is no space for reaching module fixing screws which brings trouble to dismounting of cabinets and modules 11 3 Product Instal...

Page 13: ...lications CR Series User Manual 12 Notes During the installation the Z Axis adjustment board is designed for adjusting the position of the cabinets Steel Structure Connector M8X120 full length threaded bolt 150 125 42 ...

Page 14: ...wer will be provided Please consult with your electrician or power distro manufacturers for specific setup Input voltage of cabinet is 100 240V AC 3X1 5mm2 power supply cable is used to connect the cabinets to the power distros Maximum 16 cabinets per a 220V circuit and 8 cabinets per a 110V circuit Cabinet data ports diagram Notes Single receiving card cabinet has two RJ45 as video signal input a...

Page 15: ...mpers and use the main power cables to power each circuit Note a main power run will carry a maximum of 16 cabinets per 220V circuit and 8 cabinets per 110V circuit 14 Using 4 x 4 CR1 5 setup as an example see below for data and power cabling methods Power output Pilot lamp Test button Power input 4 1 Power Cabling Input 100 240V Long power line Power line ...

Page 16: ...f the screen and cable the screen accordingly Each CAT5 port must not exceed 655 360 pixel load as illustrated down below 4 2 1 Cabling for single receiving card version As for this version both input and output of signal are for DATA1 and DATA1 have two RJ45 ports which are identical Notes During installation cabinet magnet fixed screw helps to adjust the seams between the modules 15 4 2 Signal C...

Page 17: ...Series User Manual 4 2 2 Cabling for double receiving card version As for this version route A is for DATA1 route B is for DATA2 DATA1 and DATA2 both have two identical RJ45 ports 16 Computer HDMI USB RJ45signal line Sengding box ...

Page 18: ...d the HUB board can be serviced by removing back cover After finishing cabling the cabinets use a multi meter to test the AC input L N PE and DC output VCC GND to determine whether there is a short circuit If a short circuit has been found please examine the circuit carefully Power up the cabinets only after making sure all the circuits are working properly 5 Maintenance 17 5 1 Preparation Tools 5...

Page 19: ...V1 0 Aug 2017 All rights reserved by Shenzhen Absen Optoelectronic Co Ltd Shenzhen Absen Optoelectronic Co Ltd reserves the rights to modify contents without any further notice ...

Reviews: