ABSCO INDUSTRIES
Page 16
MARCH 17
INSTRUCTION MANUAL
J23083BK
1) Ensure that 54R Channels are secured to 39D Sheets.
2) Place the 89R Jambs into position by nesting end
notches around the high edges of 54R Channels.
3) Align top & bottom holes with corresponding holes
in 54R Channel and fit FAST001 Screws.
9) Place short side of 79A Channel
in front of short side of 54R Channel.
10) Install FAST001 Screws.
4) Squeeze 89R Jambs
against rib in 39D Sheets to
align 89R Jamb as straight
as possible (check edge
of Jamb and edge of rib).
5) Pre-drill holes in 39D Sheet using
holes in 89R Jamb as guide.
6) Install FAST001 Screws.
7) Place the 90A Jamb into position
by nesting end notches around the
edges of the 89R Jambs
8) Install FAST001 Screws.
Summary of Contents for J23083BK
Page 13: ...ABSCO INDUSTRIES Page 13 MARCH 17 INSTRUCTION MANUAL J23083BK ...
Page 19: ...ABSCO INDUSTRIES Page 19 MARCH 17 INSTRUCTION MANUAL J23083BK ...
Page 20: ...ABSCO INDUSTRIES Page 20 MARCH 17 INSTRUCTION MANUAL J23083BK ...
Page 21: ...ABSCO INDUSTRIES Page 21 MARCH 17 INSTRUCTION MANUAL J23083BK ...
Page 23: ...ABSCO INDUSTRIES Page 23 MARCH 17 INSTRUCTION MANUAL J23083BK ...