background image

ABSCO HIGHLANDER SHED

MODEL: 60303HK

5.96mW x 3.00mD x 2.30mH

Model: 60303HK

29/11/2021

1.4

1  

 

 

Absco Industries

Assembly Instruction Manual

DOWNLOAD

 

OUR APP FOR

ASSEMBLY

VIDEOS

PLEASE LEAVE A REVIEW

Tell us about your experience!

Visit

 

www.abscosheds.com.au/review

AU: 1800 029 701

N Z: 0800 466 444

[email protected]

www.abscosheds.com.au

CONCRETE S

LAB

6060mm

3100m

m

When laying concrete slab, ensure there 
is a rebated edge 25mm deep around 
the perimeter. This will help water egress 
from the base of the shed.

ABSCO INDUSTRIES

ASSEMBLY INSTRUCTION MANUAL

SHED MODEL: 23151GK 

21-11-2017  

      

CONCRETE SLAB

2360mm

1620mm

FRONT:   2.26m

SIDE:       1.52m

HEIGHT:  1.95m

We thank you for choosing an Australian made

shed. For further assistance please visit our detailed

instructional video library at

Http://www.abscosheds.com.au/watch-videos

At ABSCO Industries we are always looking to be

number ONE, so please let us know what you think

of our instructions. Feedback makes us better.

[email protected]

CONCRETE 

REBATED EDGE

BOTTOM CHANNEL

CONCRETE SLAB

75mm WIDE REBATE

100mm

WHEN LAYING YOUR CONCRETE

SLAB, ENSURE THERE IS A

REBATED EDGE 25mm DEEP

AROUND THE PERIMETER

THIS WILL HELP WATER EGRESS

FROM THE BASE OF THE SHED

Absco Industries

Premier Shed Model: 23151GK

PAGE 01

For construction in non-cyclonic areas

Wind rating: N2 as per AS4055-2021.
If you require a higher wind rating please contact 
us: [email protected] or 1800 029 701

NOTE: This shed can be upgraded to wind 
rating: C1 as per AS4055-2021 with the additional 
purchase of a Cyclone Kit.

Summary of Contents for MB60303HK

Page 1: ...oosing an Australian made shed For further assistance please visit our detailed instructional video library at Http www abscosheds com au watch videos At ABSCO Industries we are always looking to be n...

Page 2: ...cal council SITE PREPARATION The site for the shed must be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down...

Page 3: ...T No CHECK QTY QTY 1 2 16 1 4 1 STEEL SHEET 1974mm X 773mm E 1 FITTINGS ACCESSORIES PACKET SEE PAGES 6 7 97AR RIDGE BEAM L 1521mm 2 2 STEEL SHEET 1974mm X 773mm F STEEL SHEET 2034mm X 711mm H34 STEEL...

Page 4: ...EL L 1496 5mm 55BL CHANNEL L 1496 5mm 2 6 2 81BL CHANNEL L 1496 5mm 81AL CHANNEL L 1496 5mm 4 56AL CHANNEL L 1496 5mm 56BL CHANNEL L 1496 5mm 77BL CHANNEL L 1496 5mm 60AL CHANNEL L 1496 5mm 55A 55C 56...

Page 5: ...1546mm 2 3 6 HC2 CHANNEL L 1974mm 1 CHANNEL WITH HINGES L 1974mm 1 79A CHANNEL L 1568mm 58C CHANNEL L 773mm CHANNEL SET CONT COMPONENT DESCRIPTION PART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY...

Page 6: ...98A RIDGE CAP JOINER COMPONENT DESCRIPTION PART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY QTY CSJ 20 CHANNEL JOINER L 200mm 7 9 1 PHILLIPS HEAD DRIVER 24 3mm 0 12 DRILL BIT 1 DOOR PADBOLT HASP...

Page 7: ...NISED 16mm TEK SCREWS STEEL SHEET 2034mm X 773mm H30 STEEL SHEET 2034mm X 773mm H31 C1484 CHANNEL L 1484mm 40 80 4 C1954 CHANNEL L 1954mm 40 80 MULTI PURPOSE BRACKET 4 COMPONENT DESCRIPTION PART No CH...

Page 8: ...the channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for sc...

Page 9: ...of the channel where the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre of the...

Page 10: ...drill holes where CSJ joining channel covers them Join together 40 x channel sections using 20 x channel joiners Part CSJ 2993mm 117 8 56BR 56BL 56AL 56AR 55CR 55CL 55AL 55AR 60AR 60AL 81AL 81AR 81BR...

Page 11: ...s when the beams are in position Step 2 Use the ZARSP to connect at the centre of the two ridge beams Be sure it is pushed in fully Step 3 Turn over the ridge beam Measure 250mm from the middle along...

Page 12: ...EL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 12 Absco Industries Assembly Instruction Manual PRE ASSEMBLY OF SPLICED RIDGE BEAM 97AL 97AR 2x 97AL 2x 97AR 2x 97A 2993mm Overall leng...

Page 13: ...uding section of each ridge beam this will allow the sections to butt up neatly to each other Cut away these two only 98A Insert the ZARSP at an equal distance into each ridge beam Confirm that the be...

Page 14: ...60303HK 29 11 2021 1 4 14 Absco Industries Assembly Instruction Manual OVERVIEW OF ROOF COMPONENTS OVERVIEW OF ROOF COMPONENTS 87A 87A 81A 60A 60A 97A 14A 45A 45A 45A 45A 45A 45A 45A 45A 81A 98A 60A...

Page 15: ...ual OVERVIEW OF WALL COMPONENTS OVERVIEW OF WALL COMPONENTS H30 H31 H31 H30 H30 H33 H33 H35 H34 H31 H31 H30 H30 H31 H31 H31 H31 H31 F E F 55B 55B H30 56A 77B 1 6 L 1 6 R 1 6 R 1 6 L 55C HC1 58C HJ3 58...

Page 16: ...2 30mH Model 60303HK 29 11 2021 1 4 16 Absco Industries Assembly Instruction Manual REAR PANEL ASSEMBLY 2 required One panel requries sheet H30 this end One panel requries sheet H30 this end H31 H31...

Page 17: ...sco Industries Assembly Instruction Manual D ROOF PANEL ASSEMBLY 45A 45A 45A 45A SNAPT TE i SNAPT TE i 60A 87A 81A 87A Two panels will have part 87A fitted to this end only Two panels will have part 8...

Page 18: ...that the assembled panels are not joined together with pre punched holes incorrectly positioned The overall length of each panel is the same as the ridge beam Trim the channels by 16 5mm to allow the...

Page 19: ...03HK 29 11 2021 1 4 19 Absco Industries Assembly Instruction Manual SIDE PANEL ASSEMBLY H30 H31 H31 H30 SNAPT TE i SNAPT TE i 77B 81A 2 required Turn the panel over Fit the two large gables 16L 16R to...

Page 20: ...NEL ASSEMBLY Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Short flange of channel Long flange of channel DOUBLE DOOR 58C 58C 58C 12A HC1 HC...

Page 21: ...3HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 21 Absco Industries Assembly Instruction Manual FRONT PANEL ASSEMBLY HJ1 HJ1 55A 90A 79A 55C SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i H34 H...

Page 22: ...PANEL NOTE Nuts and bolts are also supplied and may be used instead of rivets Use a 4mm drill bit to enlarge these holes in the jamb NOTE The holes to fasten the padbolt hasp are not pre punched to al...

Page 23: ...23 Absco Industries Assembly Instruction Manual DOOR PANEL ASSEMBLY Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Short flange of channel L...

Page 24: ...K 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 24 Absco Industries Assembly Instruction Manual FRONT PANEL ASSEMBLY SINGLE DOOR PANEL 1 required HJ1 HJ1 H33 H33 H30 56A 79B 56B 90B SNAPT TE i...

Page 25: ...PANEL NOTE Nuts and bolts are also supplied and may be used instead of rivets Use a 4mm drill bit to enlarge these holes in the jamb NOTE The holes to fasten the padbolt hasp are not pre punched to a...

Page 26: ...ab you will have to cut an amount off the bottom of the frame legs equal to the depth of the rebate TIP An easy way to make sure that the angle at the top of the portal frame is correct is to use the...

Page 27: ...es Assembly Instruction Manual HIGH PORTAL FRAME ASSEMBLY STEP 1 High portal to panel connection see section PANEL CONSTRUCTION for further infomation Secure ridge plates to apex plates M10 Dynabolt H...

Page 28: ...3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 28 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 1 Draw pattern on the concrete in accordance with the dime...

Page 29: ...HED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 29 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 2 Understand where components ar...

Page 30: ...O HIGHLANDER SHED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 30 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 3 Join C1482 to C1...

Page 31: ...O HIGHLANDER SHED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 31 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 4 Join C1482 to C1...

Page 32: ...HIGHLANDER SHED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 32 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 5 Secure ridge plat...

Page 33: ...HLANDER SHED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 33 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 6 Secure multi purpose...

Page 34: ...ER SHED MODEL 60303HK 5 96mW x 3 00mD x 2 30mH Model 60303HK 29 11 2021 1 4 34 Absco Industries Assembly Instruction Manual HIGH CENTRE PORTAL ASSEMBLY SUPPORT PHOTOS STEP 7 Turn frame over and repeat...

Page 35: ...dimensions 5960mm x 3000mm Internal wall dimensions 5920mm x 2960mm Secure multipurpose brackets to uprights using self drilling screws Move frames into postion mark and drill holes in slab using 10mm...

Page 36: ...pre punched for attaching roof sheeting The base channels are not Side wall channels fit into the notched rear wall channels Use 16mm self drilling screws to secure walls to centre frame Pre punched c...

Page 37: ...to gable sections with two screws at either end STEP 3 After the roof panels have been secured fit two gable braces 13A form the top wall channel to the underside of the ridge beam at 45 degrees as sh...

Page 38: ...Holes M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab 15 15 STEP 1 Secure the roof panels to the wall panels as shown STEP 2 Secure the roof panels to the internal frames with self dril...

Page 39: ...e installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the cons...

Page 40: ...5x45x3EA x 34mm long and 47x47x1 9EA x 80 long shall be minimum Grade 450 4 S All portal frame knee and apex plates shall be minimum Grade 450 5 S All roof and wall sheeting shall be minimum base meta...

Page 41: ...alified structural engineer The design shall consider all relevant provisions of AS3600 and AS2870 3 F Between adjacent footings or excavations the contractor installing the slab foundation shall not...

Page 42: ...elbarrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stac...

Page 43: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admi...

Page 44: ...equipment and should not be used for articles that may be prone to damage if they come into contact with moisture 3 Major Defects If the manufacturer is satisfied that the defect is a major defect the...

Reviews: