20mm
15mm
QTY = 10pcs.
CHANNEL
PUSH
PUSH
CHANNEL
CSJ
INSTRUCTIONS FOR JOINING SPLICED CHANNELS
CSJ
CSJ
HIGH-SIDE
CHANNEL
LOW-SIDE
CHANNEL
CSJ
CSJ
CSJ
=
=
=
=
=
=
=
=
STEP 1.
Position the channels and the CSJ
joiner channel so the center of the
CSJ is in line with the end of each
channel to be joined together.
STEP 2.
Join the first channel to the CSJ by inserting the center
of the CSJ (on an angle) to the end of the channel
where the JOIN>> text is marked. Push down one side
of the CSJ until you hear a 'click'.
STEP 3.
Join the second channel to the CSJ
by positioning the <<JOIN end of the
channel at the center of the CSJ
(on an angle). Push the CSJ into
the channel until you here a 'click'.
=
The joined channels should now
look like the picture above with the
CSJ positioned equally inside of the
joined channels.
FINISHED CHANNEL
=
NOTE: THE TEXT MARKED ON ALL PARTS MUST BE SHOWN ON THE SAME SIDE AS EACH OTHER.
JOIN>>
<<JOIN
JOIN>>
JOIN>>
SJ
JOIN>>
<<JOIN
JOIN>>
<<JOIN
J
CSJ
DRILL 4 x 3mm (2 PER A SIDE)
HOLES TO SECURE SECTIONS
TOGETHER.
(THESE SCREWS MAY HAVE TO
BE TEMPORARILY REMOVED
AND REPLACED DURING LATER
ASSEMBLY)
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
SHED MODEL: J23151GECOK
21-11-2017
Absco Industries ECO
Shed Model: J23151GECOK
PAGE 06