1
40
30
47
48
9
48
47
31
40
3
5
1
1. Attach the Muscle Frame ASSY(#3) and the Rotation Frame ASSY
(
#5
)
to the Upright
Frame ASSY (#1).
2. Attach the Joint Bearing (#30) to the Transfer Bar ASSY(#9) using:
two M16 Nut (#47)
3. Attach the Transfer Bar ASSY(# 9) to the Rotation Frame ASSY(#3) and the Rotation
Frame ASSY
(
#5
)
using:
two M16*65 SHCS(#40)
two M16 Nut (#48)
Note
:
Tighten the screws.
Summary of Contents for Vertical Crunch LC
Page 1: ...2004...
Page 2: ......
Page 13: ......
Page 14: ......
Page 15: ......