
⚠
Correct
use
of
Flexible
Hose
Connectors
If
this
product
is
supplied
with
flexible
hose
connections
for
ease
of
installation
you
must
observe
the
conditions
below,
failure
to
observe
these
standard
installation
guidelines
will
invalidate
the
warranty
for
your
product.
Always
screw
the
flexi
hoses
into
the
product
only
by
hand,
until
feeling
mechanical
rest,
a
spanner
must
not
be
used
on
the
product
end
of
the
connecting
hose.
Always
use
the
pipes
provided
and
not
an
alternative
substitute
The
braiding
on
the
flexible
hose
must
not
be
in
contact
with
anything
else,
for
example
chemicals,
internal
or
external
room
walls
or
dissimilar
metals
or
materials
or
sharp
objects.
Never
twist
or
stretch
the
flexible
hose
during
installation.
Do
not
overtighten
the
hexagonal
end
of
the
hose
connecting
to
the
supply
feeds
when
using
a
spanner
causing
the
hose
to
twist.
Hoses
must
not
be
double
bent
in
multiple
directions
kinked
or
looped
.
Observe
the
minimum
bend
radius
of
50mm.
Before
assembling
the
hose
to
the
product
ensure
the
hose
ferrule
has
been
crimped
(as
highlighted)
on
both
ends
of
the
hose
after
the
braided
hose
sleeve.
Both
ends
of
the
hose
must
have
a
minimum
50mm
straight
section
before
any
bend.
50mmØ
Installation:
1.
Locate
base
plinth
(B)
onto
the
fine
threaded
side
located
on
top
of
fixing
column
(D).
2.
Place
upper
seal
(C)
under
the
recess
in
base
plinth
(B).
3.
Screw
both
the
base
plinth
(B),
upper
seal
(C)
and
fixing
column
(D)
into
the
mixer
body
(A
and
over
pull
‐
out
hose
(M)),
we
recommend
gloves
as
the
thread
may
have
sharp
edges.
4.
Screw
the
hot
flexible
hose
(I)
and
cold
flexible
hose
(J)
into
mixer
body
(A)
hand
tight,
refer
to
figure
1
for
the
correct
inlets
shown
as
“H”
&
“C”.
5.
Screw
the
mixed
water
outlet
extension
(K)
into
the
mixed
water
outlet
“M”
as
shown
on
figure
1.
If
using
a
spanner
to
tighten
extension
(K)
do
not
overtighten
it
as
you
may
damage
the
seal
on
the
top
of
the
extension.
6.
Place
the
mixer
tap
(A),
with
base
plinth
(B),
upper
seal
(C)
and
fixing
column
(D)
onto
the
sink/worktop,
passing
the
flexible
hoses
(I&J),
mixed
water
outlet
(K)
and
the
pull
‐
out
hose
(M)
through
the
tap
hole.
7.
Pass
the
lower
gasket
(F),
the
metal
spacer
(G)
and
fixing
nut
(H)
over
the
fixing
column
(D),
flexible
hoses
(I,
J
&
M))
and
mixed
water
outlet
(K).
Only
If
fitting
the
tap
to
a
stainless
‐
steel
sink,
the
white
triangular
stabiliser
(E)
can
be
optionally
placed
where
shown
to
help
stabilise
the
weight
of
the
tap.
8.
With
the
tap
central
to
the
tap
hole
hold
it
securely
in
place
whilst
fastening
fixing
nut
(H)
securely
onto
the
fixing
column
(D)
to
fix
the
tap
(A)
into
its
correct
location.
9.
Fully
screw
the
pull
‐
out
hose
(M)
into
the
mixer
water
outlet
extension
(K)
using
a
small
spanner
ensuring
the
seal
(L)
is
in
place
between
the
connection.
10.
Fix
the
hose
weight
(N)
with
screws
(O)
as
shown,
it
should
be
positioned
at
the
lowest
vertical
point
on
hose
(M)
as
the
hose
returns
upwards
to
the
tap
body
(A).
11.
Connect
the
hot
and
cold
flexible
hoses
(I
&
J)
to
the
water
mains
using
½”
BSPx15mm
compression
fittings.
Note:
Non
‐
return
valves
will
be
pre
‐
inserted
into
flexible
hoses
(I
&
J).
After
Installation:
Once
you
have
visually
checked
the
new
fittings
and
connections,
ensure
that
all
taps
and
drains
are
closed
except
the
new
product
which
should
be
left
open
.
Turn
on
(reconnect)
the
water
supplies,
check
carefully
for
leaks
around
the
installation
and
product
function.
Once
you
are
sure
of
no
leaks,
close
the
new
product
and
recheck
for
leaks,
turn
on
the
water
heating
power.
Clean
and
dry
the
product
of
any
marks
from
installation
then
cover
the
product
with
the
bag
provided
to
protect
it
until
use.
Important
Technical
Data
Minimum
operating
pressure:
1.25
bar
Maximum
operating
pressure:
5.5
bar*
Flow
characteristics:
Single
flow
Maximum
hot
water
temperature
:
60°C*
Recommended
hot
water
temperature:
46°C
*If
these
temperatures
or
pressures
are
exceeded,
even
for
short
periods,
damage
can
result
and
will
void
your
warranty.
In
these
instances,
reduce
the
incoming
water
temperature
and
or
install
a
pressure
reducing
valve.
Ensure
that
your
Abode
product
is
fitted
in
accordance
with
Local
Water
Byelaws
or
regulations
by
a
qualified
installer.
These
installation
guidelines
have
been
prepared
for
your
direction
and
you
must
exercise
due
care
at
all
times.
We
do
not
accept
responsibility
for
problems
that
may
occur
through
improper
installation.
Whilst
installing
the
product
take
care
not
to
accidentally
loosen
any
screwed
assemblies.
Manufacturers
Product
Reference:
AT2190,
AT2191,
&
AT2192
©Abode
‐
03/2023
Unit
L,
Zenith
Park,
Whaley
Road,
Barnsley,
S75
1HT
Tel:
(+44)
01226
283434
or
www.abodedesigns.co.uk
All
errors
and
omissions
excepted.