PROBOIL 2 to PROBOIL.2X Upgrade Installation Guide v1b 

10 

 

2.1.4

 

Commissioning and testing 

 

You have finished the installation, now please take a few moments to go through the commissioning and testing 
process, this will ensure the product is working correctly, safely and to your satisfaction. 

 

WARNING

 You must not skip this section, we are not liable for any safety or performance issues as a result of 

not following the step by step installation guide with due care. 

1.

 

Turn on (open) fully the 98°C water handle.  

 

 

After the air is purged from the system you 

must

 continue to run cold water through the tank for a further 

minimum of a 5 minutes to flush it. 

During the flushing period check all connections made during the installation carefully for leaks.

 

2.

 

After the flushing period is completed turn off (close) fully the 98°C water handle. 

 

3.

 

Press and hold the 

 “ 

key on the boiler screen, it should switch to the standard screen and not display any error 

“E”

 codes.

    

4.

 

Press the

 

“+” 

key on the boiler screen and set the target temperature to 98°C. 

The boiler will take approximately 

9 minutes

 to reach its 

“READY”

 state. Use this time to complete the checklist 

items in this guide. 

 

The few first times the boiler fills and heats from a “fully cold” state it is normal that the tap may drip 

slightly from the spout centre channel during heating, this will self-adjust with use.

 

5.

 

After the boiler reaches its 

“READY”

 state repeat steps 1-2.

 

6.

 

With all tap handles in the closed position again check the installation carefully again for any leaks.

 

 

Summary of Contents for Pronteau PROBOIL2

Page 1: ...www proboil co uk See top of boiler unit for contact details Please read these instructions carefully before installation We have a policy of continued product and quality development and improvement...

Page 2: ...proboil2x boilers like for like if any modifications are to be made please refer to the complete user and installer guide supplied originally with the product WARNING All surfaces especially those mad...

Page 3: ...place any water connections directly near or above electrical appliances or connections WARNING This appliance is not intended to be operated by means of an external time or separate remote control s...

Page 4: ...bols are used to highlight key points or safety considerations An information point or tip for installation or usage A service maintenance or care consideration A technical or safety consideration or...

Page 5: ...uding non return valve 1 B2 15mm olive B3 15mm nut B4 15mm pipe B5 15mm isolation valve B6 Domestic hot flexible hose excluding non return valve C1 Cold out to filter boiler flexible hose including se...

Page 6: ...nit Drain fully into a suitable container or sink 6 Once drained close the unit and place the boiler to one side EITHER Bypass the existing Proboil 2 black tundish assembly This is the preferred optio...

Page 7: ...cription Drawing A PROBOIL 2X boiler unit B male boiler inlet with internal check valve C 3 8 male boiler outlet D mains power cable E flexible blue inlet pipe F x inlet pushfit connector G blue Inlet...

Page 8: ...wingnut inlet connector with integral internal flat rubber seal G hand tight do not use a spanner or overtighten on to the boiler inlet male B 3 Check that the red 3 8 x 8mm boiler outlet connector J...

Page 9: ...be too short pipe is stretched c Not be twisted or kinked when attached creating a blockage 10 Your boiler is now plumbed to the tap and the filter plug the power cord into the mains outlet but do not...

Page 10: ...he flushing period check all connections made during the installation carefully for leaks 2 After the flushing period is completed turn off close fully the 98 C water handle 3 Press and hold the key o...

Reviews: