background image

INSTALLATION GUIDE

3

Mark out fixing points centre to centre, on a level floor, 
ensuring grab rail placement meets 

AS1428.1:2021 standards.

Refer to alternative install location instructions for opposite wall 
installation.  

1061

71

1612

4

Align fixing points with rail configuration, using a level, double 
check fixing location. Drill pilot holes accordingly.

level

5

Secure fixing brackets at previously marked fixing location. 
Ensure fixing is level & fixed into appropriate structural support.

Drill

Coach Screw

Washer

Fixing Bracket

O ring

Pilot hole

6

Slide grab rails onto brackets & fix with grub screw. Ensure 
all fixings are tight and secure.  

2

Fix  grab rails to brackets using allen key provided.

Note:

 do not tighten grub screws completely, this aids wall 

mount install process.   

1

1

2

3

4

5

6

1

For rough in, refer to Step 3 for wall structure set out.

Set out grab rail in numbered configuration as illustrated below.
(Numbered indication appears on previous page).
 

1061

551

Quick Tip: 

If sliding the  

grab rail onto the brackets is 

challenging, it may help to 

remove this grub  screw 

during installation to allow 

more movement.  Be sure to 

reinstall the grub screw!

Note:

 This product must be installed by a licensed tradesperson.

 

This product’s install must comply with AS1428.1:2021 for installation 

within Australia. 

This is a general installation guide - there are many 

factors that are 

involved that can alter the installation method. 

ABI takes 

no responsibility if your product is not fixed to adequate wall structure

.

524

43

Structure

Structure

Structure

760

DO NOT use cream
cleaners or bleach.
These substances are
abrasive.

Regularly clean with
mild liquid detergent
or soap and water.

DO NOT use cleaning
pads with abrasive
sur faces as this may
scratch the material.

IMPORTANT

Loosen grub screws to 

aid installation. 

Tighten once installed.

Note: 

Dimensions are nominal measurements only

IMPORTANT

Place assembled grab rail 

against wall to aid 

wall marking/check 

before drilling.

Reviews: