Regularly clean with mild
liquid detergent or soap
and water
DO NOT use cream
cleaners or bleach.
These substances are
abrasive
DO NOT use cleaning
pads with abrasive
surfaces as this may
scratch the material
1
2
3
WHAT'S IN THE BOX
1. Body
2. Fixing screws
3. Cartridge
4. Locking nut
ROUGH IN
See Specification image for finish wall setback
Screw in-wall body into wall
structure with provided screws.
Connect hot, cold and mixed lines.
TEST AND CHECK FOR LEAKS.
Sheeting and waterproof layer can
now be applied.
*Ensure cutout in finish wall is
47mm diameter.
2
1
3
4
47mm
INSTALLATION GUIDE
Note:
This product must be installed by a licensed plumber. This is a general installation guide - there are many factors involved that
can alter the installation method.
AU/NZ:
For installations within Australia and New Zealand, this product must be installed in
compliance with AS/NZS 3500.
UK:
For installations in the United Kingdom this product must be installed in compliance with the
Water Supply (Water Fittings) Regulations and Water Supply (Water Fittings) (Scotland) Byelaws.
Other:
For installations outside
these countries, this product must be installed in compliance with the standards in your respective country.