-
Apply thread tap or other approved sealant to the spigot/nipple. Insert the
arm/dropper and then install the arm/dropper onto the spigot, ensuring it
is tight, flush with the wall/ceiling, and that the arm outlet is perpendicu-
lar/vertical.
Fit the filter/washer and flow control into the shower head according to the
diagram.
Note
: The flow control should be inserted with the protruding side into the
showerhead, taking care not to cause and damage to the flow controller.
In accordance with AS/NZS3662 CI.6e.
Fit the shower head onto the arm/dropper and ensure it is firmly tightened
to prevent leaks.
The shower head can be adjusted by swiveling into the desired position.
Note
: These showers may not be suitable for use with gravity fed water
heaters, low and unequal pressure supply networks, instantaneous water
heaters, tempering valves and/or thermostatic mixing valves. In accor
dance with AS/NZS3662 CI.6c.
The following pressure range should be complied with:
·Minimum working pressure 150Kpa
·Maximum working pressure 750Kpa
1.
2.
3.
4.
Installation Guide
ALL ABEY SHOWERS MUST BE INSTALLED IN ACCORDANCE WITH
AS/NZS3500 SERIES.
ALL ABEY SHOWERS ARE CERTIFIED IN ACCORDANCE WITH
AS/NZS 3662:2005, LICENCE NUMBER WM-022172.