28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 13.1 Lead Bubble Check/Adjustment
3 - 158
3
-
Adjust shim to achieve conditions at top and bottom of Wash block,
E Loader with new (brown plastic) Wash Block.
• Replace Wash Block.
F, G Loader.
• No adjustment..
Figure 3-84 E Loader Sample Needle Alignment
--- END ---
SL-232
Needle
Touches
Here
Needle
Almost
Touches
Here
Needle Hole
Centered
on Waste
Drain Cavity