28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.5 Mixing Limit Sensor Check/Adjustment
3 - 107
3
6. Ensure REPEAT LED is flashing.
7. Loosen limit sensor mounting screws.
8. Put volt meter
+
lead on TP Pin 4 (
9. Put volt meter
-
lead on GND.
Figure 3-56 Mixing Home and Limit Pin Locations
10.Adjust limit sensor position until TP Pin 4 just toggles from +5.0V (blocked) to
≈
0.0V (unblocked).
SL-131B
TP
[NON- CE MARK]
Pin 4 Mixing Limit
Pin 2 Mixing Home
Pin 10
Mixing Limit
Pin 4
Mixing Home
CN
5
[CE MARK]