28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.16 X-Axis Solenoid to Rack Guide Check
3 - 56
3
6.
• IF Check is OK, Platen Procedure is Complete.
• IF Check Fails, go to
“VP - 3.17 X-Axis Solenoid to Rack Guide Adjustment” (Page 3-57)
Figure 3-25 Solenoid to Rack Guide
--- END ---
Straight
Edge
SL-172B
Rack
Guide
X-Axis
Solenoids
Ensure Neither
Solenoid Extends
Past Rack Guide at
Right and Left Stops