
Operation Manual / A200-L
5 Monitoring during operation / 5.1 Oil pressure, oil temperature
© Copyright 2021 ABB. All rights reserved.
HZTL4036_EN
Rev.T
December 2021
5.1.1
Pre-lubrication and post-lubrication
CAUTION
Pre-lubrication
Serious damage to engine or property can result if the turbocharger is not
supplied with oil from the first moment after starting the engine.
u
Activate the pre-lubrication device each time before starting the engine.
The pre-lubrication time is at least 5 minutes.
The post-lubrication time is at least 10 minutes.
If the engine is operated for 5 to 10 minutes in idle mode before stopping, no additional
post-lubrication is required.
Page
36
/
145