ABB-Welcome
7.4
High building (more than 16 floors) with four lifts
Two M2306 and multi M2307 support 4 lifts
Fig. 11: Topology
Pos: 42 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Steuermodule - Online-
Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenu+++++++++++ @
9\mod_1268898668093_0.docx @ 52149 @ @ 1
Note
: The address code can not be repeated.