ABB-Welcome
Optional steps:
Step 5: Export all data from this project or import data for new project
Fig. 19
No.
Function
1
Export all lift control configuration data to one read-only Excel file. (Export
the lift control configuration of each building for future reference.)
2
Import data for a new project from Excel file
1
2