background image

  

 

 

ABB-Welcome 

 

Terminal description

 

 

 

 

 

 

 

 

 

  |  

— 8 — 

   

4.2.1 

Lock connected with terminals 10 and 11 

 

 

 
 

 

 

Exit 

Exit 

Exit 

Summary of Contents for Welcome M21311P1-A

Page 1: ...016 ABB Welcome Pos 2 Di nA4 Anleitung en Online Inhalt KN X D oorEntr y 83220 AP xxx Titelbl att 83220 AP xxx ABB 19 mod_1323249806476_15 docx 111084 1 M21311P1 A M21311P2 A M21312P1 A M21312P2 A Mini outdoor station ...

Page 2: ...ed with terminals 10 and 11 8 5 Operation 9 5 1 Configure functions of the 1st 2nd pushbutton 9 5 2 Configure functions of the general call button 11 5 3 Round pushbutton with ID card reader 12 5 4 Setting the language for the voice messages 13 6 Technical data 14 7 Mounting installation 15 7 1 Requirements for the electrician 15 7 2 General installation instructions 16 7 3 Mounting 17 7 3 1 Prepa...

Page 3: ...nents from this system The device must only be used with suitable ABB flush mounted installation sockets and rain hood Pos 10 Busch Jaeg er Neustr uktur Modul Struktur Online Dokumentati on Überschriften Fü r alle D okumente 1 Ebene U Z U mwelt 18 mod_1302614158967_15 docx 103383 1 1 3 Environment Pos 11 Busch Jaeg er Neustr uktur Modul Struktur Online Dokumentati on U mwel t Fü r alle D okumente ...

Page 4: ...the legal requirements in particular the laws governing electronic and electrical devices and the REACH ordinance EU Directive 2002 96 EG WEEE and 2002 95 EG RoHS EU REACH ordinance and law for the implementation of the ordinance EG No 1907 2006 ...

Page 5: ...Fig 1 Front overview No Function 1 Light sensor 2 Infrared LED a total of 6 3 Indicated LED a total 3 ring call and door open 4 Speaker and microphone integration 5 Round pushbutton If round pushbutton with ID card reader see details in the chapter 5 3 6 Nameplate 1 2 4 3 5 6 3 ...

Page 6: ...otary switch to set the address of outdoor station 1 9 3 Set feedback tone of pushbutton ON OFF 4 Set general call to all indoor stations in one family GC ON press button1 button2 all indoor stations ring For details see Chapter 5 2 5 Configuration function of 1st 2nd round pushbutton For details see Chapter 5 1 1 2 3 4 5 6 7 8 9 10 11 12 13 ...

Page 7: ...NO as default lock Default lock is controlled by unlock button on indoor station 8 Plug in clamps a b for connection 9 Plug in clamps Exit GND for exit button 10 Plug in clamps Lock GND for door opener 11 Plug in clamps COM NC NO for floating output door opener 12 Rotary switch to adjust default door lock release time 1 10s 13 Rotary switch to adjust loudspeaker volume ...

Page 8: ...ABB Welcome Terminal description 8 4 2 1 Lock connected with terminals 10 and 11 Exit Exit Exit ...

Page 9: ...20 DinA4 Anl eitungen Onli ne Ueberschriften 3 Bedi enel emente 20 mod_1323260220559_15 docx 111647 3 1 5 1 Configure functions of the 1st 2nd pushbutton Fig 3 Addressing No Functions 1 3 OFF 4 OFF 2 Call apartment 001 3 Call apartment 002 No Functions 1 3 OFF 4 ON 2 Call guard unit 3 Call apartment 001 3 4 DIP 1 2 3 001 002 3 4 DIP 1 2 3 Guard 001 ...

Page 10: ...ABB Welcome Operation 10 No Functions 1 3 ON 4 OFF 2 Switch on light 3 Call apartment 001 No Functions 1 3 ON 4 ON 2 Call apartment 001 3 Call apartment 002 3 4 DIP 1 2 3 001 Light 3 4 DIP 1 2 3 001 002 ...

Page 11: ...nt all 4 indoor stations different address ring 3 Call apartment all 4 indoor stations different address ring If the call forward function has been set at the indoor station this function will not work well For example 001IS has set call forward to 002 IS when press 1st round pushbutton on OS to call 001 IS if 001 IS doesn t answer the call in 5s it will not transfer to 002 IS 2 DIP 1 2 3 001 001 ...

Page 12: ...in Swipe admin card 3x Orange flash 3x Swipe card new admin 1x Green Delete admin Swipe admin card 4x Orange flash 4x Swipe card admin x 1x Green Delete all users Swipe admin card 5x Orange flash quickly Swipe admin card 1x Green During setting please swipe the same admin card Function Command Indicated LED for door open Exit settings Swipe admin card 1x or no cards swiped within 15 seconds Open a...

Page 13: ...ip switches to ON 2 Long press the 1st button for 3s to play the voice message If in English an English voice will be played If in French a French voice will be played If DI is played it means the voice synthesis function is disabled 3 Short press the 1st button to change the language 4 After choosing desired language long press the 1st button to save and exit ...

Page 14: ...05 1 Designation Value Operating temperature 40 70 Protection cover frame assembled IP 54 Power supply door opener Lock GND 18V 4A impulsive 250 mA holding Floating output door opener COM NC NO 30 V AC DC 1A Single wire clamps 2 x 0 28 mm2 2 x 0 75 mm2 Fine wire clamps 2 x 0 28 mm2 2 x 0 75 mm2 Bus voltage 20 30 V Pos 78 Busch Jaeg er Neustr uktur Modul Struktur Online Dokumentati on Steuermodul e...

Page 15: ...4017_15 docx 103564 2 1 7 1 Requirements for the electrician Warning Electric voltage Install the device only if you have the necessary electrical engineering knowledge and experience Incorrect installation endangers your life and that of the user of the electrical system Incorrect installation can cause serious damage to property such a fire The minimum necessary expert knowledge and requirements...

Page 16: ...ether with 100 240 V wires Do not use common cables for the connecting wires of the door openers and wires of the system bus Avoid bridges between different cable types Use only two wires for the system bus in a four core or multi core cable When looping never install the incoming and outgoing bus inside the same cable Never install the internal and external bus inside the same cable Pos 83 Busch ...

Page 17: ...2615960458_15 docx 103424 2 1 7 3 Mounting Pos 85 1 DinA4 Anl eitungen Onli ne Inhalt KN X DoorEntr y 83220 AP xxx M ontag e M odul e Montage Montagedose 83220 AP xxx 19 mod_1323250406848_15 docx 111098 1 7 3 1 Preparation 7 3 2 Dimension 7 3 3 Surface mounted 图 1 把后壳锁在墙上 图 2 后壳接线 图 3 把前壳与后壳盖上 7 3 4 Dismantling Use gloves to protect yourself from being cut 99mm 168mm 26mm ...

Page 18: ...ting installation 18 7 3 5 Replace nameplate s 94 Busch Jaeger N eustruktur Modul Struktur Onli ne D okumentati on Steuer module Online Dokumentation Fü r alle Dokumente Seitenumbruch 9 mod_1268898668093_0 docx 52149 1 ...

Page 19: ...er Allgemein 20 mod_1327320074886_15 docx 137103 1 Notice Ende der Liste fü r Textmar ke Backcover We reserve the right to at all times make technical changes as well as changes to the contents of this document without prior notice The detailed specifications agreed to at the time of ordering apply to all orders ABB accepts no responsibility for possible errors or incompleteness in this document W...

Reviews: