![ABB WavePro LT Installation And Maintenance Manual Download Page 10](http://html.mh-extra.com/html/abb/wavepro-lt/wavepro-lt_installation-and-maintenance-manual_4731010.webp)
10
WavePro LT Aluminium Busway
Installation and Maintenance Manual
There are vertical and horizontal installation styles in this method.
Rated Current of Plugs (A)
100
250
400
1000
L (mm)
150
195
210
300
• Horizontal installation-wall support
Pay attention to linearity of the installation hole (i.e. the entire run of supports shall be installed at the
same level at the same level). For installation types, refer to the graphic representation.
Horizontal installation along the wall may also contain vertical and horizontal installation.
Key points in horizontal installation
• When busway is placed horizontally, its distance from ground should be more than 2.2m, except for
those in electricity-dedicated rooms (e.g. distribution room, electromotor room, electric shaft room,
interlayer etc).
• The distance from wall should be more than 0.1m, and that from upper floor, ceiling floor and beam
bottom should not be less than 0.1m.
• Center distance between two neighboring parallel busways should not be less than 0.35m and it should
not be less than 0.1m from board.
• Joint should be outside of the wall.
Fig. 2.3
Busway
Wall
Bracket Arm
Edgewise
Busway
Wall
Bracket Arm
Flatwise
—
Installation
Busway Installation