Start-up
Contents of this chapter
This chapter describes how to commission the gateway to communicate with the Aurora
Vision plant management and solar inverters.
Commissioning steps
To set up the gateway
For more information, see ...
Instruction
Step
ReliaGATE 10-12-3x IoT Edge Gateway TI
AM335x LTE Cat 1 User's manual
, (REG-
ATE-10-12-3x_Man_ENG_2-0).
Check that the gateway is unpacked and installed as spe-
cified.
1
and
Make sure that the connections of the gateway are done.
2
Configuring Ethernet adapter modules of
the solar inverters (page 20)
Make sure the Ethernet adapter (FENA) module is con-
figured for inverter communication.
3
Connecting to Internet (page 21)
Check the Internet connections of the gateway.
4
Setting up wireless connection for the
gateway setup (page 21)
Connect the gateway via Wi-Fi to the PC (or other device)
that you use for the gateway setup.
5
Configuring the gateway (page 22)
Configure the gateway using ABB wizard.
6
or contact ABB
support.
Make sure you have:
• User ID and password to log in to Aurora Vision
®
Plant
Portfolio Manager
• Administrator privileges to access the Administrator tool
in Aurora Vision
®
.
7
4
Start-up 19
12
Summary of Contents for VSN900
Page 1: ... ABB SOLAR INVERTERS VSN900 gateway Commissioning manual ...
Page 2: ......
Page 4: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 16: ...16 ...
Page 18: ...18 ...
Page 23: ...Step 2 Select date time and time zone Click Next Start up 23 12 ...
Page 32: ...32 ...