background image

  VMS user manual 

8

Installation on the floor/wall: 

Floor/wall  mounting  can  be  performed  by  using  the  vertical  Z-profiles 

  at  each 

partition/extension. 

 The Z-profiles are bolted together by means of 2 C-profiles 

 and sliding nuts + M8 bolts 

for fixation. The VMS boxes can be mounted directly on the front of the Z-profiles by

means of M5 x 16 Torx screws 

. The Z-profiles can be mounted on the floor using the

stand supports 

 + 

.

Summary of Contents for VMS

Page 1: ...Modular Insulated Distribution System VMS User manual ...

Page 2: ...VMS user manual 2 Table of contents 1 Introduction 3 2 Dimensions and Technical Spec 3 3 Shipping Packing Lifting 4 4 Installation 5 5 Working with the system 9 6 Maintenance 10 7 Contact details 12 ...

Page 3: ...em can be provided as loose components or factory assembled Designed for wall mounting or floor standing installation Modular coupling possibilities in width and height Standards EN IEC 61439 2 EN IEC 60529 EN IEC 62262 Dimensions and Technical Specifications Type Designation VMS Type of material Glass fiber reinforced Polycarbonate Method of fixing Wall floor Intended location Indoor Limited Outd...

Page 4: ...n as it is unpacked If found damaged immediately contact the manufacturer at the numbers mentioned in contact details section 3 The company cannot be held responsible for any damage caused due to improper storing CAUTION Improper storing can cause damage to the enclosure Do not stack one enclosure over another while storing or during transportation 4 Use a pallet truck for transportation of the en...

Page 5: ... covers that can be opened by authorized operating personnel only Procedure for installing the enclosure on a wall Remove any obstruction dirt etc from the location Make sure the floor and wall surface is levelled The enclosure can be mounted on a wall by using brackets up to 5 enclosures or a supporting frame The brackets can be positioned 0 45 90 screw through the base corner holes Installation ...

Page 6: ...iles equal to the number of vertical sections 1 If the unit height is greater than 1000 mm three horizontal C profiles will be used The vertical C profiles are 140 mm longer than the height of the assembled panel The frame and the enclosure assembly should be mounted simultaneously Horizontal and vertical C profiles of the first row of enclosures are assembled together by clamping brackets and sli...

Page 7: ...VMS user manual 7 Following rows are then assembled the same way Frame and enclosure assemblies are mounted simultaneously ...

Page 8: ...l Z profiles at each partition extension The Z profiles are bolted together by means of 2 C profiles and sliding nuts M8 bolts for fixation The VMS boxes can be mounted directly on the front of the Z profiles by means of M5 x 16 Torx screws The Z profiles can be mounted on the floor using the stand supports ...

Page 9: ...ver should be opened Opening the covers 1 Unlock the cover s Use an appropriate screwdriver that matches the cover screws 2 Remove the cover s 3 Feeder switches can be operated Fuses can be replaced In cases where access to the busbar system is required additionally the cover plates can be removed by using a slotted screw driver The protective space is now accessible and all necessary service and ...

Page 10: ...eve IP rating no ingress of condensation Unused gland opening 5 inspection of cables glanding s 6 inspection on the effects of pollution clean with dry piece of cloth or use vacuum cleaner do not use high pressure air 7 inspection for damages 8 inspection on the effects of corrosion repair failures on surface make dry if necessary 9 inspection of sub assemblies electrical components maintenance in...

Page 11: ...call attention to information that is especially significant to understanding and operating the equipment This document is based on information available at the time of its publication While efforts have been made to ensure accuracy the information contained herein does not cover all details or variations in hardware and software nor does it provide for every possible contingency in connection wit...

Page 12: ...VMS user manual 12 Contact Please make sure that you have the Nominal Plate data before calling the service numbers ...

Reviews: