![ABB Vmax 12 Installation And Service Instructions Manual Download Page 4](http://html.mh-extra.com/html/abb/vmax-12/vmax-12_installation-and-service-instructions-manual_4654004.webp)
4
4
VMAX
- INSTALLATION AND SERVICE INSTRUCTIONS
—
1. Packing and transport
The circuit breaker is shipped in special packing, in
the open position and with the springs discharged.
Each piece of apparatus is protected by a plastic
cover to prevent any infiltration of water during the
loading and unloading stages and to keep the dust
off during storage.
Summary of Contents for Vmax 12
Page 35: ...DISTRIBUTION SOLUTIONS 35 35 ...