Operations
1. Dismantle the cable clamps, cable guide splines,
fairleads and the floor sheet
a) Unscrew the eight bolts on the floor and remove
the bottom plates.
2. Cables
a) Pull the cables through the open bottom into the
unit. Measure and cut the cables to sufficient
length, taking into consideration the installation
of the cable terminations and cable terminals.
b) Adapt the fairleads to the cable diameter and fit
them onto the cable.
4.1 Installing the cables
NOTE
The position of the medium voltage cables are
positioned L1, L2 and L3 front to back
4.1.1 Installing the cables
Parts
1. Floor sheet
2. Fairleads
3. Cable guide spline
4. Cable clamping screw
NOTE
The clamping screws are optional
1. Cable cover
2. Cable seal
3. Cable support
4. Hexagonal nuts with flange 9ADA289 M6 -
steel 8 A2F
5. Cheese-head Torx plus screw. Screw M6x12
Fastite200005HQ -BA
—
4. Cable connections