ENGINEERING
PRO CES S BUS (S MV)
1VLG5 00007 E
43
SMV Engineering tools
–
PCM600 v.2.6 or later / IEC 61850 Configuration / Process bus Communication
–
IET600 v.5.2 or later
Always use the latest version of tools and the latest relevant connectivity package for protec-
tion relays.
Detailed information on the specific protection relay and its network configuration can be
found in Technical Manual of dedicated protection relay or in the IEC 61850 Engineering
Guide, ABB Oy, Distribution Automation.
Configuration procedure in PCM600
Only four simple steps are needed to get Process Bus engineered in PCM600.
Step 1 / 4
Activation of transmission of Sampled Measured Value needs to have the SMVSENDER func-
tion block added to the Application Configuration Tool (ACT) in a voltage sender protection
relays. By adding the SMVSENDER function block new data set is automatically added to the
protection relay configuration and a control block for SMV is created.
Figure 57: Adding a SMSENDER block in the Application Configuration Tool
Supervision of Sampled Measured Value receiving status needs to have the ULTVTR1 function
block added to the ACT in all voltage receiver protection relays.
Figure 58: Adding a ULTVTR1 block in the Application Configuration Tool
Summary of Contents for UniGear Digital
Page 1: ... DISTRIBUTI ON SOLUTIONS UniGear Family UniGear Digital Engineering Guide ...
Page 2: ......
Page 3: ... DISTRIBUTI ON SOLUTIONS UniGear Family UniGear Digital Engineering Guide ...
Page 6: ......
Page 10: ......
Page 12: ......
Page 84: ...72 1VLG5 00007 E Figure94 VirtualLANs allocation in HSR PRP networks ...
Page 111: ......
Page 112: ... Visit us www abb com mediumvoltage Document Number 1VLG500007 Rev E ...