
Operation Manual / TPL76-C
5 Maintenance / 5.5 Cleaning components mechanically
© Copyright 2018 . All rights reserved.
HZTL2485_EN
Revision F
April 2018
4. When the cartridge group is horizontal, secure one chain block to one
of the upper push-off threads using a swivel lifting eye and suspend
from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.
Page
64
/
133