1. Suspend cartridge group from normal suspension point and suspend
from first crane.
2. Secure two lifting loops with swivel lifting eyes in the lower push-off
threads and suspend from a second crane.
3. Rotate cartridge group horizontally by lifting the second crane.
4. When the cartridge group is horizontal, secure one chain block to one
of the upper push-off threads using a swivel lifting eye and suspend
from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.