![ABB Totalflow microFLO G4 Startup Manual Download Page 4](http://html.mh-extra.com/html/abb/totalflow-microflo-g4/totalflow-microflo-g4_startup-manual_3358004.webp)
2
2) Screw the 2” by 40” mounting pipe into the saddle. Vertically
align. Upon alignment, tighten the mounting pipe into the saddle.
3) Position the µFLO
G4
on the 2” mounting pipe. Secure in place
with associated hardware. Position the µFLO
G4
high enough to
allow slope from the externally mounted manifold to the tap
valves.
2B
Wall Mount Installation
1) Drill the mounting holes in the wall supports. Upon completion,
install the wall-mounting brackets onto the back of the µFLO
G4
.
2) Lift and align the µFLO
G4
wall-mounting brackets with the holes
that were drilled into the wall. Insert the associated bolts through
the µFLO
G4
’s mounting brackets and into the wall.
3) Securely tighten all the bolts to attach the unit to the wall.
Position the µFLO
G4
high enough to allow slope from the
externally mounted manifold to the tap valves.
2C
Direct Mount Installation
1) Attach the Integral Multi-Variable (IMV) to the manifold. Before
alignment, ensure that the Teflon seal rings are in place around
the two process ports.
2) Using the components supplied with the manifold, secure the
IMV to the manifold.
Summary of Contents for Totalflow microFLO G4
Page 1: ......