2TLC172121M0201 Rev.E
7
4
Installation
•
The Tina unit shall be attached to the M20 entry (Tina 2A) before the safety cables are
connected to the device.
•
See max. tightening torque in chapter “Technical data”.
4.1
Installation precautions
Warning!
All safety functions shall be tested before starting up the system.
4.2
Testing safety functions
After each step the status of the input can be read on the monitoring device.
Steps for testing
LED indication
DYNlink signal output
1. Interrupt the DYNlink safety
circuit before the unit to be
tested
Green/red flashing *
Shall go low
2. Close the DYNlink safety
circuit
Green
Shall generate a DYNlink
signal
* If connected as “Emergency stop 3” (see illustration in chapter “Connection examples”) the
LED indication on Tina will be “Red”.