Technical data....................................................................................67
Current peaks during the start of a charge session (DC output).................................. 72
Mass and center of gravity.................................................................................................... 72
12.10.1 Mass........................................................................................................................... 72
12.10.2 Center of gravity, power cabinet......................................................................... 72
12.10.3 Center of gravity, charge post..............................................................................73
Dimensions............................................................................................................................... 75
12.15.1 Power cabinet.......................................................................................................... 75
12.15.2 Charge post..............................................................................................................75
12.15.3 Height of user operable elements....................................................................... 76
Space requirements................................................................................................................ 77
12.16.1 Power cabinet.......................................................................................................... 77
12.16.2 Charge post..............................................................................................................78
12.16.3 Charge post: exceptions for bollards and other minor fixed obstacles......79
12.16.4 Distance requirements between power cabinet and charge post............... 80
Foundation specifications.................................................................................................... 80
12.17.1 Power cabinet (prefab concrete).........................................................................80
12.17.2 Power cabinet (custom)........................................................................................ 84
12.17.3 Charge post (prefab concrete)............................................................................ 86
12.17.4 Charge post (custom)............................................................................................88
Cable specifications................................................................................................................91
12.19.1 AC input cable for the power cabinet................................................................. 91
12.19.2 DC power installation cables ............................................................................... 91
12.19.3 PE cable.....................................................................................................................92
12.19.4 AC auxiliary power cables......................................................................................92
12.19.5 Interlock and DC guard cables............................................................................. 92
12.19.6 Optical CAN cables between the power cabinet and the charge post........ 93
12.19.7 Cable for the tilt sensor control...........................................................................93
Contents
6
9AKK107992A2254-EN | 005
Summary of Contents for Terra HP Generation 3 CE
Page 96: ......