ABB Sensi+ Quick Start Manual Download Page 3

 

Sensi+ Quick Start Guide 

3

Proper planning and preparation will result in detailed documents providing information for:

•  Physical location and mounting of the instrument
•  Cabling and communication
•  Gas sampling and gas connection
•  Instrument configuration

All documents produced during preparation and planning should be available to qualified and 
authorized personnel in charge of installing and commissioning the instrument, and to the authority 
having jurisdiction (AHJ).

Handling the Instrument

The instrument weighs 50 kg (110 lb). It is not designed to be handled by one person. At least two 
people should be handling the instrument.

To avoid personal injuries, make sure to follow the proper lifting and carrying instructions when 
handling the instrument.

General Lifting and Carrying Precautions

The use of proper methods for lifting and handling objects protects against injury and makes work 
easier. Over time, safe lifting technique should become a habit.

The following are essential steps to safe lifting and handling:

•  Eyeball the load and check overall conditions. Do not attempt to lift by yourself loads that appear to 

be too heavy or unwieldy.

•  Make sure that there is enough room for movement, and that the footing is secure.
•  Be careful with your balance. Feet should be shoulder width apart, with one foot behind the object 

that is to be lifted and the other just beside it.

•  Bend your knees (do not stoop). Keep your back straight (not necessarily vertical) and tuck your chin 

(it helps straightening your back).

•  Grip the load with the palm of your hands and your fingers.
•  Push UP with your legs.
•  Keep arms and elbows close to your body while lifting.
•  Carry the load close to your body. Do not twist your body while carrying the load. To change 

direction, shift your foot position and turn your whole body.

•  To lower the object, again, bend your knees (do not stoop). To deposit the load on a bench or shelf, 

place it on the edge and push it into position. Make sure that your hands and feet are clear when 
placing the load.

Summary of Contents for Sensi+

Page 1: ...in charge of planning instrument installation electrical connection commissioning operation and maintenance Carefully plan any installation modification or repair before actually proceeding Electrical WARNING Do not make electrical connections unless the electrical code designation stamped on the instrument data plate matches the classification of the area in which you want to install the instrume...

Page 2: ...ABB customer service as indicated on the last page of this guide Planning for Installation and Commissioning All personnel participating in the planning installation commissioning and maintenance of the Sensi Gas Analyzer must have read and fully understood the following documentation Sensi Product Safety Guide part no 3KXG165001R4501 Sensi Installation and Commissioning Guide part no 3KXG165001R4...

Page 3: ...er time safe lifting technique should become a habit The following are essential steps to safe lifting and handling Eyeball the load and check overall conditions Do not attempt to lift by yourself loads that appear to be too heavy or unwieldy Make sure that there is enough room for movement and that the footing is secure Be careful with your balance Feet should be shoulder width apart with one foo...

Page 4: ...ible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in part is forbidden without prior written consent from ABB ABB 2022 ABB Inc Measurement Analytics 3400 rue Pierre Ardouin Québec Québec G1P 0B2 Canada Phone North Ameri...

Reviews: