8.5.8
Technical data
Table 96:
TRPTTR technical data
Function
Range or value
Accuracy
Base current 1 and 2
(30–250)% of
IBase
± 1.0% of I
r
Operate time:
2
2
2
2
p
ref
I
I
t
ln
I
I
t
æ
ö
-
ç
÷
= ×
ç
÷
-
è
ø
EQUATION1356 V2 EN
(Equation 56)
I = actual measured current
Ip = load current before overload
occurs
Iref = reference load current
I
p
= load current before overload
occurs
Time constant τ = (1–500)
minutes
IEC 60255–8, ±5% + 200 ms
Alarm level 1 and 2
(50–99)% of heat content trip
value
± 2.0% of heat content trip
Operate current
(50–250)% of
IBase
± 1.0% of I
r
Reset level temperature
(10–95)% of heat content trip
± 2.0% of heat content trip
8.6
Breaker failure protection 3-phase activation and
output CCRBRF
8.6.1
Identification
Function description
IEC 61850
identification
IEC 60617
identification
ANSI/IEEE C37.2
device number
Breaker failure protection, 3-phase
activation and output
CCRBRF
3I>BF
SYMBOL-U V1 EN
50BF
8.6.2
Functionality
CCRBRF can be current based, contact based, or an adaptive combination of these two
conditions.
Breaker failure protection, 3-phase activation and output (CCRBRF) ensures fast
back-up tripping of surrounding breakers in case the own breaker fails to open.
CCRBRF can be current based, contact based, or an adaptive combination of these two
conditions.
Current check with extremely short reset time is used as check criterion to achieve
high security against inadvertent operation.
1MRK 504 135-UEN A
Section 8
Current protection
179
Technical manual
Summary of Contents for ret650
Page 1: ...Relion 650 series Transformer protection RET650 Technical manual ...
Page 2: ......
Page 40: ...34 ...
Page 62: ...56 ...
Page 84: ...78 ...
Page 208: ...202 ...
Page 376: ...370 ...
Page 414: ...408 ...
Page 530: ...524 ...
Page 562: ...556 ...
Page 620: ...614 ...
Page 668: ...662 ...
Page 669: ...663 ...