VA
VB
VC
VN
VA
VA
VB
VC
IE
D
T
E
S
T
S
E
T
IE
D
ANSI07000107-1-en.vsd
VB
VC
VN
1
2
ANSI07000107 V2 EN
Figure 49:
Connection of the test set to the IED for test of V2 block level
where:
1
is three-phase voltage group1 (V1)
2
is three-phase voltage group2 (V2)
2.
Apply voltage higher than the highest set value of
VDTrip
,
V1Low
and
V2Low
to the
V1 three-phase inputs and to one phase of the V2 inputs according to figure
The voltage differential PICKUP signal is set.
3.
Decrease slowly the voltage in phase VC of the test set until the PICKUP signal
resets.
4.
Check V2 blocking level by comparing the voltage level at reset with the set
undervoltage blocking
V2Low
.
11.6.5.2
Check of voltage differential trip and alarm levels
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure
.
1MRK 504 165-UUS -
Section 11
Testing functionality by secondary injection
Transformer protection RET670 2.2 ANSI
219
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...