4.2.5.1
Configuration example 1
GUID-02D562B1-4A43-454F-86E3-2C757665FF88 v1
An example on how to configure the IED analogue inputs for HV, two-phase
railway power system, including AT-catenary railway supply system is shown in
Figure
IL1
TRM_40.CH1(I)
IL2
TRM_40.CH2(I)
UL1
TRM_40.CH7(U)
UL2
TRM_40.CH8(U)
BOM_4.BO1
BOM_4.BO2
SMAI1
BLOCK
G1AI2P
O:1IT:3II:1
G1N
GRP1L1
G1AI1
GRP1L2
G1AI2
GRP1L1L2
G1AI3
GRP1N
G1AI4
SMAI2
O:1IT:3II:2
BLOCK
GRP2L1
GRP2L1L2
GRP2N
GRP2L2
G2AI2P
G2N
G2AI1
G2AI2
G2AI3
G2AI4
I2P
U2P
BLOCK
BLKZ
BLKZ1
BLKZ2
BLKZ3
TRIP
TRZ1
TRZ2
TRZ3
START
STZ1
STZ2
STZ3
O:920IT:3II:1
ZGTPDIS
Trip
Logic
IEC17000019-1-en.vsd
IEC17000019 V1 EN-US
Figure 19:
Typical configuration for two-phase power system or AT-catenary
supply system
It is assumed that the four analogue inputs are wired to the IED (i.e. UL1, UL2, IL1
and IL2) and proper VT and CT ratios are set on the TRM card. Symbols used are
typical for HV, two-phase power system. Note that for AT-catenary system, some
other annotations are often used as given in the following list:
•
IL1 is current in phase L1 (catenary current for AT-system)
•
IL2 is current in phase L2 (negative feeder current for AT-system)
•
UL1 is phase L1 voltage (catenary-to-ground voltage for AT-system)
•
UL2 is phase L2 voltage (negative feeder-to-ground voltage for AT-system)
When configuration shown in Figure
is made, the preprocessing block will
perform the following:
•
Quantities for the first phase (i.e. UL1 and IL1) will be directly measured from
the TRM
•
Quantities for the second phase (i.e. UL2 and IL2) will be directly measured
from the TRM
•
Phase-to-phase values (i.e. UL1L2 = (UL1-UL2) and IL1L2 = (IL1-IL2) ) will
be internally calculated
•
Positive sequence quantities (i.e. U1 = (UL1-UL2)/2 and I1 = (IL1-IL2)/2 )
will be internally calculated
•
Zero sequence quantities (i.e. 2Uo = (UL1+UL2) and 2Io = (IL1+IL2) ) will
be internally calculated. Note that, these two values are also known as residual
quantities.
•
Alternatively, the 2Io and 2Uo quantities can be directly measured on the
TRM, instead to be internally calculated. To perform that, they shall be wired
Section 4
1MRK 506 375-UEN A
Analog inputs
60
Railway application RER670 2.2 IEC
Application manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 22: ...16 ...
Page 48: ...42 ...
Page 70: ...64 ...
Page 80: ...74 ...
Page 100: ...94 ...
Page 210: ...204 ...
Page 364: ...358 ...
Page 384: ...378 ...
Page 468: ...462 ...
Page 494: ...488 ...
Page 504: ...498 ...
Page 505: ...499 ...