Observe that the zones that are not tested have to be blocked and the zone that is
tested has to be released.
4.
Repeat steps
to find the operating value for the phase-to-earth fault L3–E
according to figure
and table
.
Test points 8, 9. 10 and 11 are intended to test the directional
lines of impedance protection. Since directionality is a common
function for all 5 measuring zones, it is only necessary to test
points 8, 9. 10 and 11 once in the forward direction in order to
test the accuracy of directionality (directional angles).
Directional functionality testing (trip inside, no-trip outside)
should always be made for all impedance zones set with
directionality (forward or reverse).
10.4.1.2
Measuring the operating time of distance protection zones
Procedure:
1.
Subject the IED to healthy normal load conditions for at least two seconds.
2.
Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 12 in figure
and table
for zone 1. Compare the result
of the measurement with the setting
t1PP
.
3.
to
to find the operating time for the phase-to-earth fault
according to test point 12 in figure
measurement with the setting
t1PE
.
4.
Repeat steps
to find the operating time for all other used measuring zones.
Observe that the zones that are not tested have to be blocked and the zone that is
tested has to be released.
10.4.1.3
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
10.4.2
Phase selection with load encroachment, quadrilateral
characteristic FDPSPDIS
Prepare the IED for verification of settings outlined in section
The phase selectors operate on the same measuring principles as the impedance
measuring zones. So it is necessary to follow the same principles as for distance
protection, when performing the secondary injection tests.
Section 10
1MRK 506 355-UEN A
Testing functionality by secondary injection
94
Line distance protection REL670 2.1 IEC
Commissioning manual
Summary of Contents for Relion 670 Series REL670
Page 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Page 2: ......
Page 30: ...24 ...
Page 34: ...28 ...
Page 64: ...58 ...
Page 68: ...62 ...
Page 90: ...84 ...
Page 254: ...248 ...
Page 260: ...254 ...
Page 269: ...263 ...