Figure 36:
Importing the SCD configuration into the SAB600 project
4.
In the
SCL Import
view, click
Select File
to select the SCD file exported from
PCM600.
GUID-6F47B4AD-B956-4F77-A6A2-DE6F4A71D607 V2 EN
Figure 37:
Creating a new IED into SAB600 project
Section 4
1MRS241255 B
Setting up a project
54
611 series